– 15 –
1
2
5
6
20
21
22
7
9
10
11
23
15
16
17
18
19
25
26
24
3
4
12
13
14
27
28
29
31
32
8
30
B
B
A
I
L
I
L
N
N
2-2. REMOVAL OF CP1 BOARD AND ST1 BOARD
1. Spacer flash
2. Spacer holder flash
3. Spacer lens unit
4. Spacer lens unit 2
5. Screw 1.7 x 4
6. Holder flash
7. Remove the solder.
8. Screw 1.7 x 4
9. Screw 1.7 x 4
10. Earth joint
11. CP1 board
12. FPC
13. Spring batt eject
14. Terminal batt
15. Cover triger
16. Spacer ST1
17. Two screws 1.7 x 2
18. Connector
19. ST1 board
20. Remove the solder.
21. Spacer H flash B
22. Assy, lamp
23. Screw 1.7 x 2
24. Holder CP1
25. Screw 1.7 x 2
26. Holder CP1 2
27. Two screws 1.7 x 6
28. Assy, holder strap
29. Gasket strap
30. Screw 1.7 x 3.5
16
3
4
1
31. Spring lock lever
32. Lever batt lock
When assembling
The air leak test should be carried out
between steps 26 and 27.
At this time, 12. Cabi left, 13 Gasket
cabinet and 9, 10, 11 six screws on
page 12 should be assembled to the
main body, and carry out the air leak
test. When the air leak test is finished,
disassembling above parts.