– 16 –
SG219/J-3
1
2
3
31
32
33
34
35
36
37
38
B
A
B
A
c
b
a
d
A
A
C
C
19
4
5
5
6
7
8
9
10
11
12
13
14
15
15
16
17
18
20
21
21
22
22
23
24
25
26
27
28
29
30
30
4
B
A
d
E
G
E
D
D
C
C
F
H
G
F
M
H
2-3. REMOVAL OF LCD AND VF1 BOARD
When assembling,
tighten the screws
order.
A
→
B
→
C
When assembling,
tighten the screws order.
a
→
b
→
c
→
d
When assembling,
tighten the screws order.
A
→
B
3
4
2
1
Installing the gasket LCD (step 36)
Install from directly above in the order of
the numbers so that the FPC is not twisted.
When assembling,
tighten the screws order.
A
→
B