Page 9 of 9
11
Seal Installation – Cut the Bulb Vinyl [JJ] and the
Panel Seal [KK] to the vertical length of your Door
Glass. Press the Bulb Vinyl on the strike side of the Door
Glass and the Panel Seal on the other, below the Header
Bar. A small amount of silicone can be used between the
glass and seal if you like.
12
Set the Stops – Move the door to the closed
position. Slide the Stopper [FF] over until it touches
the bottom of the roller on the strike side of the door,
making sure that the bottom of the stopper will clear the
top of the door glass. Tighten the Stopper Set Screw [GG.
Move the door to the open position with the handle 1/4” -
1/2” from hitting the fixed panel. Slide the other stopper
over until it just touches the bottom of the roller on the fixed
side of the door. Tighten the Stopper Set Screw.
13
Finishing Up – Make sure that all fasteners are tight.
Clean all exposed marks you made on the sill and
walls of the shower stall. Clean the glass panels.
14
Allow 24 hours for any silicone to completely cure,
before using your new Alumax Shower Door.