1 2
3 4
15
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
3) Insert the wall anchors into the two holes, then
place the two self tapping screws through the
mounting piece and into the wall anchors.
Wall Mount Installation - Round SlimLine Clock - Battery Powered
1) Place the mounting piece on the wall. Leave at
least 4 inches between the top of the gang box and
ceiling. Confirm that the bottom of the mounting
piece is level with the floor.
4) Remove the back cover from the battery pack
by pulling the two latches away to either side and
sliding the cover out.
2) Use a pencil to mark the positions of the top two
holes, then use the 1/4 inch drill bit to drill holes at
the locations of the two marks.
4” Minimum