7
Unpacking the Platform
Important note:
These instructions apply to platforms that are 60 x 80 cm and larger.
§
Remove the weighing platform and weighing pan from the packaging.
§
When transporting or lifting the device, hold the unit on the longer sides and observe the
safety precautions (wear safety shoes and gloves if necessary).
§
Remove any plastic wrapping, packaging strips and styrofoam.
Removing the Transport Locking Device
§
Bring the scale to the location where it will be used and remove the weighing pan.
§
Loosen the transport locking device by removing screw 1.
§
Loosen screw 2, turn the fastening bracket by 180? and then tighten screw 2.
§
Tighten screw 1 again at the lever.
Important Note Regarding Transport of the Weighing Platform
!
Be sure to refasten the transport locking device before transporting the weighing
platform.
Level the weighing platform at the weighing location using the adjustable feet so that the
air bubble is centered in the level indicator circle. Check that all four adjustable feet are
in contact with the surface.
The load must be equally distributed over all four leveling feet.
Summary of Contents for CH1NE
Page 102: ...CH Platform Dimensions Scale Drawings CH G CH E 102 ...
Page 108: ...108 ...
Page 109: ...109 ...
Page 110: ...110 ...
Page 111: ...111 ...
Page 112: ...112 ...
Page 113: ...113 ...
Page 114: ...114 ...
Page 115: ...115 ...
Page 116: ...116 ...
Page 117: ...117 ...
Page 118: ...118 ...
Page 120: ......