Operating Instructions PMA 35001-X
9
Installation
Setup Instructions
The following ambient conditions must be avoided when selecting the installation
location so you can work with extra speed and accuracy:
– Uneven installation location
– Drafts
– Extreme moisture or chemical vapors
– Extreme heat (e.g. avoid placing the terminal/control panel in close proximity to
a heater or exposing it to direct sunlight). Do not set up the device in a control
cabinet or in any other poorly ventilated location.
– Extreme vibrations
Follow all warnings and safety precautions.
– Before startup, make sure that the power cable is properly connected to the
power supply. In particular, the protective conductor must be connected to the
housing of the AC adapter. Connect all devices to the potential equalization
using a ground connection cable (not included) via the equipotential bonding
conductor terminals
on the device.
Make sure that the cable gage conforms with national specifications.
Installation must be carried out properly by trained personnel and according to
commonly accepted technical standards.
– Only cables and cable lengths approved by Sartorius should be used, which
take account of the limitations of the cable lengths due to the capacity and
inductance values (see appendix on EC Type Examination Certificate) and the
EMC behavior.
– The system should only be operated for the first time when it is certain that the
area is not potentially explosive.
– If deviations are evident during startup due to transport damage (no display,
no backlighting, etc.), the system should be disconnected from the power
supply and service professionals should be contacted.
Make absolutely sure that the device is unplugged from the power supply
before connecting/disconnecting data transfer or control lines.
This explosion-protected color-mixing scale should be set up according to
commonly accepted technical standards. The applicable national electrical
codes and safety regulations for your particular country must be observed.
– Before commissioning the color-mixing system in potentially explosive areas, a
check must be carried out by or under the supervision of a qualified electrician
to ensure that the system is in good working order.
Check whether or not the competent authorities (e.g. industrial supervisory board)
need to be informed. It is also necessary to carry out inspections of the system
during operation. Inspection intervals should be such that any significant defects
that may occur can be identified in good time. Inspections should be carried out
at least once every three years. The applicable requirements and guidelines should
also be observed during operation.
Summary of Contents for PMA.Power Series
Page 29: ...Operating Instructions PMA 35001 X 29 EC Declaration of Conformity...
Page 30: ...30 Operating Instructions PMA 35001 X ECDeclaration of Conformity...
Page 32: ...32 Operating Instructions PMA 35001 X EC Verification...
Page 33: ...Operating Instructions PMA 35001 X 33 EC Verification...
Page 34: ...34 Operating Instructions PMA 35001 X EC Verification...
Page 40: ...40 Operating Instructions PMA 35001 X Certificate of Compliance...
Page 41: ...Operating Instructions PMA 35001 X 41 Certificate of Compliance...
Page 42: ...42 Operating Instructions PMA 35001 X Certificate of Compliance...
Page 43: ...Operating Instructions PMA 35001 X 43 Certificate of Compliance...