In the  "traditional combustion " mode: 
black coal for energetic  applications of size grade of nut coal  (class  24/12 acc.  to 
PN-91/G-04510). 
With  water  furnace,  it  is  possible  to  apply  with  good  results    so  called  long  flame 
fuels, such as:  brown coal and wood in different forms, e.g. chips, silvers,  shavings, 
etc.  The wood has to be seasoned at least one year! 
Wet wood combustion lowers the efficiency and the lifetime of a boiler. 

 

 

 

 

Boiler’s assembling  should  be  performed    by  qualified  and  authorized  personnel   
(qualified  person upon adequate training and authorized for performing maintenance 
and repair works). The  fitter’s  obligation  is  to  get  familiar  with  the  product, its  
functioning  and  protection  systems functionality. 

 

 

Prior to boiler’s  assembling  it  is  strictly necessary  to  get familiarized  with  

the content  of  hereby Technical-Start-Up Documentation. 

 

 

 

5.1. REQUIREMENTS FOR BOILER-ROOM 

  

The  boiler  room,    where  the  heating  boiler  for  central  heating  installation  shall  be 
installed, must conform the requirements of detailed regulations being in force, at the 
country of destination (e.g. PN-87/B-02411). 

 

In particular, the following requirements shall be fulfilled: 

 

the    boiler    rooms    should    be    located    as    centrally    as    possible    to    rooms  
which  are  covered  with  heating system,  and the boiler itself should be placed 
as close as possible to  chimney  (chimneys), 

 

boiler    rooms  entrance  door  should  be  opened  on  the  outside,  and  be  made  of 
inflammable materials,

 

 

the  boiler  room  should  have  air  blow-out  ventilation,  a  channel  with  section  no 
less than 50% of the chimney section, but not less than 21 x 21 cm, with the exit 
at the back  part boiler’s room, (lack of such ventilation or obstruction may cause: 
smoking, inability to get higher temperature),

 

 

the  boiler  room  should  have  blow-  out  ventilation  under  room’s  ceiling  with 
section no less than 25%  of the chimney  section,  but  not less than  14   x   14 
cm (the purpose of  this system is to  carry out   harmful gases).

 

 
NOTE: Employing of  mechanical blow-out ventilation is  unacceptable. 
 
The boiler room should be provided with day and artificial lighting. 

 

 

5.  BOILER ASSEMBLY GUIDELINES

 

Summary of Contents for MULTI Series

Page 1: ...M E T A L O W O K O T L A R S K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boilers for heating installations SAS...

Page 2: ...tallation 15 6 Operation and exploitation guidelines 16 6 1 Filling with water 16 6 2 Firing up and functioning of a boiler 16 6 2 1 Firing up and functioning of a boiler in automatic mode 17 6 2 2 Fi...

Page 3: ...3...

Page 4: ...ater temperature does not exceed 85 C and working pressure does not exceed 1 5 bar Required gases draught pressure after a boiler is 0 30 0 45 mbar depending on boiler s power These boilers may also w...

Page 5: ...in the temperature set on the controller The controller constantly measures the temperature of water boiler Depending on the results it controls fuel feeder and ventilator At the same time the control...

Page 6: ...arge cleaning door pos 6 furnace door pos 11 and ash box door pos 13 are placed on the boiler s front For periodic cleaning operations and also for firing up a boiler the retort may be accessed throug...

Page 7: ...1200 1280 A1 mm 290 290 305 305 330 330 B mm 1110 1235 1235 1300 1300 1300 B1 mm 450 535 535 605 605 605 H mm 1430 1430 1490 1490 1590 1590 H1 mm 1300 1300 1375 1375 1475 1475 H2 mm 980 980 1050 1050...

Page 8: ...door 14 air intake dosage flap 15 air draft regulator 16 connecting strip 17 hot water connector pipe 18 upper washout hole cover 19 smoke conduit clearing hole 20 smoke throttle 21 smoke conduit 22...

Page 9: ...tent to 10 Ash melting temperature 1150 C Low coal swelling coal should not tend to stick when burner Volatile particles content 30 40 It is recommended to use coal which is prone to agglomeration cok...

Page 10: ...allation shall be installed must conform the requirements of detailed regulations being in force at the country of destination e g PN 87 B 02411 In particular the following requirements shall be fulfi...

Page 11: ...k draught may also cause or help in carbon black forming which is then settling down on the boiler s convection channels If the draught is too strong it will cause excessive air to draw into the retor...

Page 12: ...system provided with three or four pass valve The main advantage of such connection is boiler protection function against low temperature corrosion preventing it from premature wear If not satisfacto...

Page 13: ...d down 6 2 FIRING UP AND OPERATE A BOILER Before fuel fire up it is mandatory to check installation filling with water Water can t be frozen It must be checked also if there is no water leakage on boi...

Page 14: ...as varying fuel quality may cause the boiler to burn out If the fire is out during up phase the furnace should be cleaned and boiler s channels ventilated and the whole starting procedure must be rep...

Page 15: ...ve At the same time the controller operates the heating system circulation pump if such is provided Heat requirement in the heat installation is varying due to changing outdoor conditions such as the...

Page 16: ...t those adverse phenomena should go away During normal exploitation of boiler in the traditional combustion mode burning process is based on periodic refueling Single load of basic fuel is sufficient...

Page 17: ...of burned fuel and apply cleaning and conservation of the entire boiler Pay special attention to lubricate inner partitions of combustion chamber and all movable elements with oil For the period of br...

Page 18: ...ection channels walls disrupts proper heat transfer from the exchanger lowering this way an efficiency of device and increases fuel consumption 6 6 OPERATE AND MAINTENACE OF A FEEDER AND RETORT Feeder...

Page 19: ...nstallation improper functioning of controller or fan adjust controller s settings up to weather conditions or quality of fuel mainly feeder operation time and fuel delivery pauses should be changed t...

Page 20: ...oal reduce the set of fuel supply by 5 10 or increase blow in power Wait 20 30 minutes until such changes come to effect what should be deflected in change of fire state In order to ensure the failure...

Page 21: ...arried out by authorized team Before connecting a boiler to a heating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boiler...

Page 22: ...on alterations made by user or other third parties will cause the warranty to be invalid 8 Application of reclamation should be addressed at manufacturer 9 Boiler replacement realized by manufacturer...

Page 23: ...umentation however basic described properties of the product shall be maintained Any remarks and questions on boiler s SAS type exploitation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Prz...

Page 24: ...24 SERVICE REPAIRS...

Page 25: ...25 SERVICE REPAIRS...

Page 26: ...perature boiler of SAS MULTI type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Reviews: