51
AE1016H/AE1016H-3
ES
PT
JA
RU
EN
DE
KO
中文
Chapter III Transportation, Unpacking and Storage
3.1 Transportation
Tire changer shall be transported in its original package.
The packaged tire changer shall be handled with the properly loaded forklift with the fork inserted as shown in (Fig. 3.1).
AE***
Standard
:
260Kg.
GT:303Kg
Fig. 3-1
3.2 Unpacking
Remove the cardboards and nylon bags for protection.
Check if the equipment is in good condition and ensure that the parts are not missing or damaged.
3.3 Storage
If the long-term storage is required, ensure the disconnection of power and lubricate the clamping jaw rail on the large plate to prevent
oxidation.
In case of any doubts, do not use the machine and contact the retailer.
Summary of Contents for AE1016H
Page 2: ......
Page 37: ...37 AE1016H AE1016H 3 ES PT JA RU EN DE KO 中文 7 5 气动原理图 如图所示 升降气缸 三位五通阀 调压阀 ...
Page 44: ...44 AE1016H AE1016H 3 ES PT JA RU EN DE KO 中文 气动原理图 ...
Page 86: ...86 AE1016H AE1016H 3 ES PT JA RU EN DE KO 中文 Pneumatic Schematic Diagram ...
Page 128: ...128 AE1016H AE1016H 3 ES PT JA RU EN DE KO 中文 Pneumatikschaltplan ...
Page 170: ...170 AE1016H AE1016H 3 ES PT JA RU EN DE KO 中文 Пневматическая схема ...
Page 212: ...212 AE1016H AE1016H 3 ES PT JA RU EN DE KO 中文 에어 원리도 ...
Page 254: ...254 AE1016H AE1016H 3 ES PT JA RU EN DE KO 中文 Diagrama pneumático ...
Page 289: ...289 AE1016H AE1016H 3 ES PT JA RU EN DE KO 中文 7 5 空気圧回路図 図のように 昇降シリンダー 三位置五方弁 調圧弁 ...
Page 296: ...296 AE1016H AE1016H 3 ES PT JA RU EN DE KO 中文 空気圧回路図 ...
Page 339: ......