52
WP
33L_
BA_K
1_1
2_en_
08.
fm
8.3 Maintenance schedule
Instructions for
the maintenance
schedule
• Use the maintenance schedule as a master template or copy
the respective page from the document and save it as a sepa-
rate file under a suitable name. Use the maintenance schedule
as a guide for evidence that work has been carried out.
• Regularly check the maintenance schedule to see which main-
tenance intervals, depending upon the number of operating
hours, are due. The intervals are shown in the table's column
headers.
• Check the column of each maintenance interval to see what
maintenance work is to be carried out at the end of each main-
tenance interval. The required tasks are indicated by check
boxes. The description for the tasks is shown in the first co-
lumn.
•
Carry out
all maintenance work for an interval and
tick
the ap-
propriate check boxes of the maintenance schedule.
Then
enter
operating hours count, date and your signature.
• When beginning a new maintenance schedule
–
enter
: main specifications, date of commissioning, number
of maintenance schedule, current date and operating hours
count
–
tick
: beginning after commissioning/after major overhaul
Danger!
For all maintenance work Chapter 8.4 “Table of tightening
torques” must be observed for identified screws, bolts and nuts.
Note!
The maintenance intervals specified in the maintenance schedu-
le must be adhered to. Shortening the maintenance intervals is
of no advantage with regard to operating performance or service
life of the Sauer compressor.
Note!
We recommend to carry out an inspection (functional check) by
authorised persons at least once a year.
Note!
After 4,000 operating hours the maintenance schedule begins all
over again.
The major overhaul after 8,000 operating hours shall be carried
out by personnel authorised by Sauer.
Summary of Contents for WP 33 L
Page 4: ...Zertifikate_en_0 fm Genuine Sauer spare parts certified safety SPECIMEN...
Page 85: ...S a u e r C o m p r e s s o r Type WP 33 L Spare Parts List...
Page 89: ...Spare Parts List WP33L_ET_en_08 fm E 5...
Page 94: ...E 10 WP33L_ET_en_08 fm 060 315 Compressor WP33L 100 21 17 22 1 19 20 11 12 2...
Page 96: ...E 12 WP33L_ET_en_08 fm 060 315 Compressor WP33L 100...
Page 100: ...E 16 WP33L_ET_en_08 fm 061 383 Dipstick 3 1...
Page 102: ...E 18 WP33L_ET_en_08 fm 060 317 Crankshaft 4 5 2 6 3 7 5 4 1...
Page 104: ...E 20 WP33L_ET_en_08 fm 060 280 Connecting rod 1st stage 1 4 7 5 6 50 Nm...
Page 106: ...E 22 WP33L_ET_en_08 fm 060 283 Connecting rod 2nd stage 1 4 7 5 6 50 Nm...
Page 108: ...E 24 WP33L_ET_en_08 fm 034 989 Piston 1st stage 7 3 4 5 6 2 1...
Page 110: ...E 26 WP33L_ET_en_08 fm 060 319 Piston 2nd stage 7 3 4 5 1 6 2...
Page 112: ...E 28 WP33L_ET_en_08 fm 068 628 Cylinder with head and valve 1st stage 3 2 4 5 1...
Page 114: ...E 30 WP33L_ET_en_08 fm 068 615 Cylinder with head and valve 2nd stage 2 3 4 1...
Page 118: ...E 34 WP33L_ET_en_08 fm 060 328 Crankcase vent 3 1 2 5 6 060 328 1st stage...
Page 120: ...E 36 WP33L_ET_en_08 fm 030 915 Safety valve 1st stage 1 3...
Page 122: ...E 38 WP33L_ET_en_08 fm 030 752 Safety valve 2nd stage 1 3...
Page 124: ...E 40 WP33L_ET_en_08 fm 060 440 Air pressure piping 7 8 4 6 2 4 6 9 1 5 10...
Page 126: ...E 42 WP33L_ET_en_08 fm 060 312 Separator 2 7 8 1 4 6 3 8...
Page 128: ...E 44 WP33L_ET_en_08 fm 035 010 Pressure gauge 1 2...
Page 130: ...E 46 WP33L_ET_en_08 fm 060 354 Automatic drainage system 3 1 4 5...
Page 132: ...E 48 WP33L_ET_en_08 fm 060 589 Resilient mounts 3 5 1 4 2 6 4 2 6...
Page 134: ...E 50 WP33L_ET_en_08 fm 065 568 Resilient mounts 3 5 1 4 2 6 4 2 6...
Page 136: ...E 52 WP33L_ET_en_08 fm 061 001 Hose line 1 2...
Page 138: ...E 54 WP33L_ET_en_08 fm Flexible coupling 1 2 3 Compressor Motor...
Page 140: ...E 56 WP33L_ET_en_08 fm Flexible coupling 1 2 3 Compressor Motor...
Page 142: ...E 58 WP33L_ET_en_08 fm...