Maintenance
WP
33L_
BA_K
1_1
2_en_
08.
fm
53
Maintenance Schedule No.:
Compressor type:
Maintenance schedule beginning
:
Type series
2L
after commissioning
Compressor number:
after major overhaul
Factory No.:
Date:
Year of construction:
Operating hours:
Date of Commissioning:
1 000
2 000
3 000
4 000
periodically
8 000
Checking screwed connections
Air filter cartridge replacement
Oil change
Checking valves
Replace valves
Checking piston rings
Replace piston rings
Replace gudgeon pins and gudgeon pin bearings
Checking pistons and cylinders
Checking drive bearings
Checking connecting rod bearings
Checking coupling
Replace coupling flexible insert
Checking separator
Replace shaft seals
Checking safety valves
Major overhaul
50 h after
commissio-
ning
50 h after
major over-
haul
Min. annually
if < 1,000 h
per year
Checking screwed connections
Oil change
Operating hours
Date
Signature
(initials)
Interval
[Operating hours]
Maintenance work
Interval
[Operating hours]
Maintenance work
Summary of Contents for WP 33 L
Page 4: ...Zertifikate_en_0 fm Genuine Sauer spare parts certified safety SPECIMEN...
Page 85: ...S a u e r C o m p r e s s o r Type WP 33 L Spare Parts List...
Page 89: ...Spare Parts List WP33L_ET_en_08 fm E 5...
Page 94: ...E 10 WP33L_ET_en_08 fm 060 315 Compressor WP33L 100 21 17 22 1 19 20 11 12 2...
Page 96: ...E 12 WP33L_ET_en_08 fm 060 315 Compressor WP33L 100...
Page 100: ...E 16 WP33L_ET_en_08 fm 061 383 Dipstick 3 1...
Page 102: ...E 18 WP33L_ET_en_08 fm 060 317 Crankshaft 4 5 2 6 3 7 5 4 1...
Page 104: ...E 20 WP33L_ET_en_08 fm 060 280 Connecting rod 1st stage 1 4 7 5 6 50 Nm...
Page 106: ...E 22 WP33L_ET_en_08 fm 060 283 Connecting rod 2nd stage 1 4 7 5 6 50 Nm...
Page 108: ...E 24 WP33L_ET_en_08 fm 034 989 Piston 1st stage 7 3 4 5 6 2 1...
Page 110: ...E 26 WP33L_ET_en_08 fm 060 319 Piston 2nd stage 7 3 4 5 1 6 2...
Page 112: ...E 28 WP33L_ET_en_08 fm 068 628 Cylinder with head and valve 1st stage 3 2 4 5 1...
Page 114: ...E 30 WP33L_ET_en_08 fm 068 615 Cylinder with head and valve 2nd stage 2 3 4 1...
Page 118: ...E 34 WP33L_ET_en_08 fm 060 328 Crankcase vent 3 1 2 5 6 060 328 1st stage...
Page 120: ...E 36 WP33L_ET_en_08 fm 030 915 Safety valve 1st stage 1 3...
Page 122: ...E 38 WP33L_ET_en_08 fm 030 752 Safety valve 2nd stage 1 3...
Page 124: ...E 40 WP33L_ET_en_08 fm 060 440 Air pressure piping 7 8 4 6 2 4 6 9 1 5 10...
Page 126: ...E 42 WP33L_ET_en_08 fm 060 312 Separator 2 7 8 1 4 6 3 8...
Page 128: ...E 44 WP33L_ET_en_08 fm 035 010 Pressure gauge 1 2...
Page 130: ...E 46 WP33L_ET_en_08 fm 060 354 Automatic drainage system 3 1 4 5...
Page 132: ...E 48 WP33L_ET_en_08 fm 060 589 Resilient mounts 3 5 1 4 2 6 4 2 6...
Page 134: ...E 50 WP33L_ET_en_08 fm 065 568 Resilient mounts 3 5 1 4 2 6 4 2 6...
Page 136: ...E 52 WP33L_ET_en_08 fm 061 001 Hose line 1 2...
Page 138: ...E 54 WP33L_ET_en_08 fm Flexible coupling 1 2 3 Compressor Motor...
Page 140: ...E 56 WP33L_ET_en_08 fm Flexible coupling 1 2 3 Compressor Motor...
Page 142: ...E 58 WP33L_ET_en_08 fm...