background image

6

www.saunacore.com

S

TEAMCORE

Locating the Steamcore Steam Generator Unit:

1. Plan the location for mounting your steam generator.

2. Do not install generator inside steam room.

3. Do not install generator outdoors.

4. Do not install generator near combustible or corrosive materials or
chemicals.

5. Place the generator in a dry and easy accessible location for future
periodic maintenance. Locate steambath generator preferably within 25
feet of the steam room, though it may be placed up to 50 feet away.

6. A gravity drain will be necessary for all units.

7. Never locate a unit that may be exposed to frost, fire, or high moisture.Do
not install steambath generator in unheated attic or basement where

 

water

could freeze.

8. The unit must be located on a solid and flat level surface.

9. Install generator in an upright position only.

10. Steam line, and drain valve become hot during operation. Provide
appropriate protection.

11. Commander Controls and Air Switch Control can be located inside the
steam room or on the outside of the steam room. See seperate cont

r

ol

installation and operation instructions for specific details. Mechanical
controls are located outside the steamroom, a remote sensor is required for
all controls

12. Install anti-water hammer device as required.

13. Provide access to both ends of the steambath generator for servicing.

Steam Bath Generator (Sizing and Selection)

Measure the length, width and height (in feet) of the steam shower. Multiply
the three measurements together to get the basic volume in cubic feet.

L xx W

W xx H

H =

= C

CUBIC F

FEET xx %

% ((wall ffinish)

Add the cubic footage to one of the wall finishes

Ceramic Tile 

25%

Natural Stone 

100%

Fiber Glass/Acrylic 

0%

Steam Line 50ft+ 

20%

Glass Block Wall 

10%

Steam Line Subject to Freezing 

25%

Glass Wall

10%

Locating the Steamcore Steam Generator Unit

Example:

A ceramic steam shower with the demensions 7ft
length by 5ft wide and 7ft high (7ft x 5ft x 7ft =
245), is 245 Cubic feet.

Since the steam shower has ceramic wall finishes,
it then requires a 25% cubic footage increase. 

(Ceramic tile) 25% x (steam shower) 245 = 
61.25 ft

The wall finish cubic feet is then added to the
origin dimensions to calculate the total cubic,
which in this case is 306.25 ft. 

(ceramic tile) 61.25 + (steam shower) 245 =
306.25 ft

Now select the next size of Steamcore model
generator which exceeds the calculated room
cubic feet. This case the KWS (9000 watts)
generator is required. If there is doubt in size, it is
recommended to choose the next larger size.

Summary of Contents for KWS 10.5

Page 1: ...ATOR SAUNACORE INSTALLATION INSTRUCTIONS FOR STEAMCORE STEAM GENERATORS CONTROLS INSTALLATION GUIDE OWNERS MANUAL SAUNACORE www saunacore com This Manual contains installation and operation instructio...

Page 2: ...51 6662 Inspection and Shipping Claim Check for shipping damage upon receipt of the product Saunacore is not responsible for damage to the product sustained during shipping If damage is evident before...

Page 3: ...ter filter is recommended 9 Make sure water is turned on to the unit before testing or operating the unit 10 Unit and Supply lines MUST be protected from freezing Parts Enclosed Control Steamhead Stea...

Page 4: ...ce to be performed by qualified electricians and plumbers only Installation or service by unqualified persons may void the warranty Installation Instructions Pressure Safety Valve s Supplied Only must...

Page 5: ...ate to accumulate 8 All inside surfaces should be adequately sealed Around faucets shower head and steam heads should be sealed with mildew resistant silicone 9 Ceiling height should be no higher than...

Page 6: ...located outside the steamroom a remote sensor is required for all controls 12 Install anti water hammer device as required 13 Provide access to both ends of the steambath generator for servicing Stea...

Page 7: ...units 1 Check power voltage Most homes have 240V IPH service 2 Use minimum 90 deg C 300V copper conductors only sized in accordance with National and Local electrical codes 3 Connect equipment ground...

Page 8: ...ower steam room When connecting you must use the two wrench method or you may break the seal on the connection between the drain pipe and the boiler tank and cause leakage Testing Now that your Steamc...

Page 9: ...h will help extend the life and minimize maintenance schedules of the steam bath generator Maintenance Saunacore steambath generators are designed for unattended operation and require little maintenan...

Page 10: ...he way from the steam generator to the waste outlet Under certain conditions it may be necessary to place the steam generator on the wall brackets or a stand to achieve the right angle Cleaning the St...

Page 11: ...ong as you feel comfortable After your last spell amongst the clouds of steam you ll find a long cool shower a real delight Let your body dry off naturally before putting your clothes on Relax treat y...

Page 12: ...ply Air Gap Drain 1 or 1 2 Steam Line Outlet 1 Steam LIne 1 1 2 Pipe Slope Down Floor Drain 1 Water supply Typical Residential Plumbing Installation ELEGANCE STEAM HEAD INSTALLATION 3 4 NPT Female mad...

Page 13: ...ure 1 2 pipe slope down Two Elegance Steam Heads Water supply 1 or 3 4 Steam Line KWS 9 KWS 18 Commercial Plumbing Installation with Elegance Steam Head s KWS 22 5 KWS 36 Commercial Plumbing Installat...

Page 14: ...e silicone or tape sealant when threading onto st prevent steam leaks for connections A 15 p s i Pressure Relief Safety Valve and coupling has been supplied with your steam generator unit It must be i...

Page 15: ...e Aroma Essential Oils in a Steamcore steam head or any other equivalent oil deemed suitable for use in the Steamcore steamhead Caution Use essential oils with caution Essential oils are for external...

Page 16: ...ide the steambath enclosure according to personal preference It is recommended that the SSI Control is located about 4 to 5 feet above the floor The control should be located away from direct shower s...

Page 17: ...17 User Manual Control panel both SSI and SSII dimension 113mm 25mm 75mm SSI and SSII Control panel may be switched for Spa II SS I SS I I 160mm 120mm 23mm 70mm...

Page 18: ...Important Do not install the controller under the water pipe or in a position where water comes into contact Step two Drill a round hole of 35mm in diameter in a chosen position no larger or smaller...

Page 19: ...ig 2 5 Let the temperature sensor go through the back of the sensor holder As shown in Fig 3 6 The temperature sensor should be installed by extending about 1cm from the front of the room to make sure...

Page 20: ...Adjust Key LOW Steam Time Adjust Key HIGH 2 9 3 2 8 2 4 7 6 6 Power ON OFF When unit is powered on power indicator LED should be lit Press and release button to activate system and all function button...

Page 21: ...eam time when system is activated Steam time LED screen shows set time from 1 99 minutes System shuts down power supply to heater elements automatically when desired steam time is over Use and buttons...

Page 22: ...t stop or pause in the preset time to keep the temperature in the set number ON OFF When it is electrified the system shuts off all the loads to remain in a waiting state and the digital tube will dis...

Page 23: ...ube will display normally current environment temperature When the system is started press button or when the steam function time is due the system will be shut 10 minutes after the system is shut off...

Page 24: ...shown in Fig 7 1 Wait for the completion of automatic water discharge after each time of using the steam generator to make sure the water in the tank is discharged completely before cutting off power...

Page 25: ...s ight s Page 25...

Page 26: ...Page 26...

Page 27: ...ck Long Pin Yellow Middle Pin Red Red Blue Brown Red Light G L1 L2 L3 Red Red J1 2 Red Red J1 1 Red Red J3 2 Red Red J2 To Control Panal Terminal Block J2 2 J1 1 J1 2 J3 1 J2 1 J3 2 J1 J2 J3 Yellow Gr...

Page 28: ...8V 1 57 7 208V 3 33 4 450V 3 15 4 575V 3 10 6 KWS 13 5 13500 625 240V 1 56 3 2 1 4 2 208V 1 64 9 208V 3 37 5 450V 3 17 3 575V 3 13 6 KWS 15 15000 685 208V 3 41 7 2 1 4 2 450V 3 17 3 575V 3 13 6 KWS 18...

Page 29: ...eam generat or Cause The contr ol panel is incorrectly set Solution Check the time and t emperature on the contr ol panel Cause The f ilter is clogged Solution R emove the filter which is placed in th...

Page 30: ...tween the control panel and the electrically controlled box has become loose and whether the power circuitry has good contact 2 Change a plugboard Water leakage 1 The water pipe connector becomes loos...

Page 31: ...year This cost will include 2 maintenance services per year for your Steamer including par ts repair s and labour _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Reviews: