7
S
TEAMCORE
Steam Generator Positioning:
The steam generator must be properly positioned for it to work. Place the
steam generator TOP UP, which will be indicated on the Unit with arrows.
The steam line(s) are on the top of the unit. The water inlet, electrical
connection box, and drain are on the sides of the unit. Installation in any
other way will cause malfunction or damage to you steam generator, voiding
your warranty.
Water Connections:
All plumbing shall be performed by a qualified plumber and in accordance
with applicable National and Local codes. Use unions on all pipe
connections. Use only brass piping or copper tubing. Do not use black,
galvanized or PVC pipe. Connect your water supply (cold water) to your unit
with a ¼, ½ or ¾ inch soft copper tubing. An inline filter has been installed
by the factory. When connecting the steam lines, drain, and the pressure
relief loop (commercial units) one must use two wrenches, one to hold the
fitting from the steamer and the other to tighten the fitting which is being
connected.
1. Connect hot or cold water line. Hot water should not exceed 160 degree
Fahrenheit. (Cold is preffered)
2. Provide a shut off valve in the supply line.
3. Do not overheat inlet solenoid valve with solder connections. Overheating
will damage parts.
4. Flush inlet water line thoroughly before making connection to unit.
5. Strainer is required if there are solid particles in the water.
6. For proper performance water pressure must be 15-20 psi.
Electrical Connections:
All electrical wiring to be installed by a qualified and licensed electrician in
accordance with National and Local codes. All power rating, electrical
connections and wiring is clearly labeled on all units.
1. Check power voltage. (Most homes have 240V, IPH service).
2. Use minimum 90 deg. C/300V copper conductors only, sized in
accordance with National and Local electrical codes.
3. Connect equipment grounding wire to ground terminal provided.
4. Install a separate circuit breaker between supply and unit.
5. On single phase units, use two-wire supply source with ground. Neutral
(white) wire is not required
, but may be used
.
General Installation Instructions
(All Steam Bath Units)
6. A suitable metal conduit and metal conduit connector should be used for the
main power wiring connections.
The total connected load should not be more then
80% of the rating of the overcurrent devices.
CAUTI
ON !
!
Th e st
eam h ead(
s)
(
or
nozzl
e(
s)
)
cr
eat
e ver
y
h i gh degr
ee of
t
emper
at
ur
e in and ar
ound t
h e
st
eam h eads dur
i ng use.
Th e st
eam h eads
shoul
d be inst
al
l
ed as f
ar
away f
r
om any bat
h er
s
pat
h .
Bat
h er
s ar
e t
o avoid t
h i s ar
ea and f
r
om any
dir
ect
cont
act
t
o t
h e st
eam h eads.
Bur
n or
injur
y
may occur
if
t
ouched or
in t
h e vicinit
y dur
i ng use.
Appr
opr
i at
e pr
ot
ect
i on shoul
d be pr
ovided t
o
avoid injur
y.
CAUTI
ON !
!
Th e st
eam h ead(
s)
(
or
nozzl
e(
s)
)
cr
eat
e ver
y
h i gh degr
ee of
t
emper
at
ur
e in and ar
ound t
h e
st
eam h eads dur
i ng use.
Th e st
eam h eads
shoul
d be inst
al
l
ed as f
ar
away f
r
om any bat
h er
s
pat
h .
Bat
h er
s ar
e t
o avoid t
h i s ar
ea and f
r
om any
dir
ect
cont
act
t
o t
h e st
eam h eads.
Bur
n or
injur
y
may occur
if
t
ouched or
in t
h e vicinit
y dur
i ng use.
Appr
opr
i at
e pr
ot
ect
i on shoul
d be pr
ovided t
o
avoid injur
y.
Summary of Contents for KWS 10.5
Page 25: ...s ight s Page 25...
Page 26: ...Page 26...