Steam generator
Water Drain Valve
Water Inlet Pipe
Steam outlet pipe
Control panel
Supply
Steam Outlet
Pressure
relief
valve
!
7.
Stable and horizontal.The steam generator has a hanging groove for
mounting
on
the
wall.Make sure the machine is steady and horizontally installed.
8.
On both sides and the top of the steam generator need
s
at least 12 inches
of clearance
space.
9.
The place where the machine is installed must be easily
accesible
and convenient for
the disassembly of the machine.
10.
The installation place must be convinent for the drain of wate
r
.
11.
The steam
pipe
,
saf
e
ty valve, drain valve,water tube,steam outlet are still very h
ot
after
the steam generator ha
s
stopped working for some time.
Keep the steam outlet
away from the people. Bodily injury or burn may occur, provide appropriate protection.
12.
The controller must be installed in the steam room,please refer to the instruction
of the controller's installation and operation of the manual.
The steam generator(including the controller)
comply with CE
, CSA
and
UL certificat
ion standards.
!
Page 2
Attention:
Attention:
Installation drawing of the steam generator
T h e d r a w i n g i s o n l y
f o r
s a m p l e
. A s f o r p r a c t i c a l
d e s i g n o f s t e a m r o o m , p l e a s e
c o n s u l t w i t h q u a l i f i e d d e s i g n e r,
a r c h i t e c t o r b u i l d e r .
User Manual
Fill & Drain Solenoid Valves
Control Cable
(20ft max)
Summary of Contents for Xtreme Steam Tech Steamcore Spa II
Page 30: ... s ight s Page 28 ...
Page 31: ... ...