Positioning of Appliance for Final Installation
- above worktop, foreseeable obstructions etc.
Recommend 2 persons lift appliance to position into place. Fit
bracket securely onto wall before lifting appliance into position.
Obtain firm grip on front and sides of appliance, lift upwards,
onto worktop if practicable. Ensure stable balance achieved
and lift upwards to position in place on bracket. If 2 persons
positioning onto bracket obtain firm grip at front and sides/base
of boiler. Ensure co-ordinated movements during 2 person lifts
to ensure equal spread of weight of load. Ensure safe lifting
techniques are used - keep back straight - bend using legs -
when lifting load from floor level. Do not twist - reposition feet
instead. Keep boiler as close as possible to body throughout lift
to minimise strain on back. Avoid upper body/top heavy
bending - do not lean forward/sideways. Always use assistance
if required. Recommend wear suitable cut resistant gloves with
good grip to protect against sharp edges and ensure good grip
when handling appliance.
Positioning of Appliance for Final Installation
- within compartment etc. restricting
installation.
Recommend 2 persons lift appliance to position into place,
space permitting. Fit bracket securely onto wall before lifting
appliance into position. Obtain firm grip on front and sides of
appliance, lift upwards, onto worktop if practicable. Ensure
stable balance achieved and lift upwards to drop into place onto
bracket. If 2 persons positioning onto bracket obtain firm grip at
front and sides/base of boiler. Ensure co-ordinated movements
during 2 person lifts to ensure equal spread of weight of load. If
1 person positioning onto bracket recommend obtain firm grip
supporting base of boiler. Ensure safe lifting techniques are
used - keep back straight - bend using legs - when lifting load
from floor level. Do not twist - reposition feet instead. Keep
boiler as close as possible to body throughout lift to minimise
strain on back. Always use assistance if required. Recommend
wear suitable cut resistant gloves with good grip to protect
against sharp edges and ensure good grip when handling
appliance.
Positioning of Appliance for Final Installation
- in roof space restricting installation.
Recommend 2 persons lift appliance to position into place,
space permitting. Fit bracket securely onto wall before lifting
appliance into position. Obtain firm grip on front and sides of
appliance, lift upwards, ensure stable balance achieved and lift
upwards to drop into place onto bracket. If 2 persons positioning
onto bracket obtain firm grip at front and sides/base of boiler.
Ensure co-ordinated movements during 2 person lifts to ensure
equal spread of weight of load. If 1 person positioning onto
bracket recommend obtain firm grip supporting base of boiler.
Ensure safe lifting techniques are used - keep back straight -
bend using legs - when lifting load from floor level. Do not twist
- reposition feet instead. Keep boiler as close as possible to
body throughout lift to minimise strain on back. Always use
assistance if required. Recommend wear suitable cut resistant
gloves with good grip to protect against sharp edges and ensure
good grip when handling appliance. It is recommended a risk
assessment of the roof space area be carried out before moving
the appliance into the area to take into account access, stability
of flooring, lighting and other factors, and appropriate measures
taken.
Summary of Contents for EnviroPlus F24e
Page 18: ...18 2000225294A Diagram 5 1 11907 5 Boiler Schematic F24e F28e ONLY ...
Page 19: ...19 2000225294A 5 Boiler Schematic Diagram 5 1a 12248 BYPASS F28e SB ONLY ...
Page 49: ...49 2000225294A 14 Fault Finding 12410 Diagram 14 4 ...
Page 51: ...51 2000225294A 15 Wiring Diagram Diagram 15 1a 12240 F28e SB ONLY ...