Savant Power System Deployment Guide - Sol-Ark
Copyright 2022 Savant Systems, Inc
009-2222-01 | 121222
- 16 -
6. HomeGrid Battery Stack
6.1. Installation
Physical installation of the HomeGrid Stack’d series batteries must
be completed on a level, unobstructed surface.
IMPORTANT:
Do
NOT
connect the BMS to any energized cabling
during this step.
1.
Place the Stack’d base on the floor.
2. Remove black sticker on bottom of the first Battery Module.
3. Stack the battery module onto the base.
4. Remove both side covers for the installed module.
5. Repeat steps 2-4 with remaining modules.
6. Place the Battery Monitoring System (BMS) ontop of the stack,
with no power connected to it.
7. Remove the top and side covers of the BMS.
To the bottom right is an example with four battery modules.
|||||
|||||
||||||
||||||||
|||||
||||
||||
||||
|||||
||||
||||
|||
|||
|||
|||
|||
|||
|||
||
1
3
7
6
4