background image

12

Finally, install the feeding bowls and lid (g+h) on both side panels, the 
bird bath (f ) and drinking fountain (n) and your cage is now ready for use

.

f

g+h

n

Summary of Contents for Primo 60 Open Empire

Page 1: ... info savic be Doc nr 931887 Assembly instructions for the Primo 60 Open Empire Richtlijnen voor de montage van de Primo 60 Open Empire Instructions pour le montage de la Primo 60 Open Empire Aufbau Anleitung des Primo 60 Open Empire Instrucciones de montaje de la Primo 60 Open Empire инструкция по сборке Primo 60 Open Empire ...

Page 2: ... that a minimum of two people is required for assembling this cage Please take a few minutes to read your instructions fully to ensure perfect flawless assembly of your Primo 60 Open Empire cage Check that you have all the contents as per the list on the following page If any component parts are missing or damaged do not use your cage More information and instruction video on www savic be i i j k ...

Page 3: ...oof panel b 4 side profiles c 5 wooden perches d 4 corner pieces e 1 bird bath f 4 feeding bowls lids g 1 drinking fountain h 2 side panels with door i 1 lower back panel without door j 1 lower front panel with door k 1 upper back panel without door l a b c d e f g h ...

Page 4: ...e panels with door i in the vertical profiles c Make sure that the closures are facing outwards and the panels are well placed in the corner pieces e Slide the lower front panel with door k into the profiles Make sure the door is facing upwards and the vertical wires of the panel are facing outwards k i ...

Page 5: ...hout door j in the profiles Make sure that the vertical wires are facing outwards 5a Slide upper back panel without door l into the profiles Make sure the vertical wires are facing outwards and the panels are assembled as shown l j 5b ...

Page 6: ...7a Assemble 4 of the 5 wooden perches d 6 Slide the upper front panel with door m into the profiles Make sure the door is facing upwards and the vertical wires of the panel are facing outwards m d ...

Page 7: ...op Make sure that the thick horizontal wires of the front back and side panels are well assembled in the roof panel see detail 9a 9b Open the doors of the roof panel and install the 5th wooden perch Put the cage on the tray b m a 8b ...

Page 8: ...12 Finally install the feeding bowls and lid g h on both side panels the bird bath f and drinking fountain n and your cage is now ready for use f g h n ...

Reviews: