Main Tube:
The main tube (8) is installed on the front rail using the M8 x 16 hex
head bolts with captured washers (7). Position the tube on the front rail with the
rulers facing up and the 12” ruler on the left side. The tube and rail can be slick, so
be careful that the tube does not fall off the rail. Align the holes in the rail with the
holes in the bottom of the tube. Thread the M8 x 16 hex head bolts through the rail
and into the threaded holes in the bottom of the tube (Fig. 23) and hand-tighten.
Note: the hardware bag includes enough hardware to mount the 52” tube. If you
have a 36” assembly, disregard the extra hardware.
Fig. 21
Finally, adjust the position of the foot (19) on the bottom of both support legs (18) to ensure the legs are in solid contact
with the ground. Tighten the nut (16) (Fig. 22).
Place the straight-edge on the middle of the table (Fig. 20), and then turn the screw (31) in the adjustment bracket with a
5 mm hex key to level the middle of the extension table. If using the supplemental mounting kit, push up or down on the
middle of the table, and then tighten the socket head bolt (A) (Fig. 21).
Fig. 19
make sure to tighten the bolts that
attach the leg support brackets to
the front and rear rails
straight-edge
Page 10
|
SawStop T-Glide Fence System - Industrial Series II
Fig. 20
Fig. 22
Fig. 23
7
31
8
19
18
16
Alignment, 36 and 52 Inch Fence Systems:
Use a straight-edge to level the front edge of the extension table to the
saw table (Fig. 19). You may have to pull up or push down on the extension table to level it. Once the front edge of the
extension table is level, use a 5 mm hex key and a 13 mm wrench to fully tighten the nuts on the bolts along the front rail.
Repeat the process to level the rear edge of the extension table. Also fully tighten the bolts that attach the leg support
brackets to the front and rear rails.
A