Information regarding assembly and commissioning 

Prior to being installed in the ventilation system, the fire 
damper must be checked for damage. Damaged fire damp-
ers must not be installed. 
 
The device may only be used in accordance with its desig-
nated use in air ventilation systems for supply air and return 
air. 
 
Use only approved fastening material for mounting. 
 
No additional parts may be  
fastened to the fire damper. 
 
The fire damper must be connected to the ventilation duct 
network on both sides in electrically conducting fashion. 
 
In order to avoid the risk of static charges, the fire damper 
must be connected to the on-site equipotential bonding on 
the grounding connection provided for this purpose. 
 
Make sure that the ventilaton systems are not subjected to 
any anomalous operating conditions, such as vibrations, 
pressure surges or high proportions of solids in the medium. 
 
 

Information regarding maintenance and inspection 

Proper maintenance increases operational safety and the 
service life of the device. This is why the devices should be 
subjected to regular inspection. 
 
If inspection dates are prescribed by law, they must be com-
plied with. 
 
The operating personnel must be informed, prior to starting 
maintenance and inspection work. 
 
The personal safety measures must be looked up in the safe-
ty data sheet. Hazard caused by contact or inhaling hazard-
ous substances must be excluded by taking appropriate safe-
ty measures. 
 
Prior to maintenance or inspection, all system components 
up- and downstream of the device must be switched off and 
secured against being switched on again. 

 
 
The following inspection criteria must be observed: 

 

Visual inspection of the device 

 

Check the fastening of the device 

 

Check the electrical connections 

 

Check the grounding connection for tight fit and good 
contact. 

 

Functional check 

 

For additional inspections, please refer to the technical 
documentation or additional maintenance instructions. 

 

Use and electrical connection of actuators in areas 
subject to explosion hazards 

Only ATEX-approved electrical equipment according to ATEX 
Directive 94/9/EC for Zones 1, 2, 21, 22, such as actuators, 
terminal boxes and thermocouples as specified by SCHAKO 
KG may be used for devices from SCHAKO KG. 
 
The connection lines must be installed for permanent use 
and in such a way that they are sufficiently protected from 
mechanical and thermal damage. 
 
Devices with explosion-protected drives and terminal boxes 
have to be attached over the external potential connecting 
terminal to the potential equalisation provided by the cus-
tomer with at least 4 mm² cooper solid-core. 
 
The electrical connection lines of the actuators  
must be connected in a terminal box according to ATEX Di-
rective 94/9/EC for Zones 1, 2, 21, 22 if the electrical connec-
tion is made in the area subject to explosion hazards. 
 
The dimensioning of the conductor cross-sections must be 
observed. 
 
The actuators are maintenance-free with respect to their 
function, but the relevant maintenance regulations accord-
ing to ATEX directives or factory regulations must be ob-
served. 
 

Summary of Contents for BSK-RPR Series

Page 1: ...0 200 D 78600 Kolbingen www SCHAKO de info SCHAKO de BSK RPR Fire Damper Contents GENERAL CONDITIONS 1 DESCRIPTION 3 MODELS AND DIMENSIONS 4 Additional operating instructions according to EC Certifica...

Page 2: ...operator s internal work operating and safety regu lations must be observed DESIGNATED USE The devices have been designed for use in ventilation sys tems in areas subject to explosion hazards accordin...

Page 3: ...rved in connection with these additional operating instructions For maintenance servicing retrofitting etc it may be nec essary to provide on site inspection openings in suspended ceilings shaft walls...

Page 4: ...10 BF 1 Housing 2 Damper blade 3 Hand lever 4 Locking profile 5 Trigger device 6 Fusible link 7 Mounting frame AR 8 Drive unit 9 Earthing connection 10 Drive X10 ExMax 5 10 BF 11 Safety temperature l...

Page 5: ...Version 2015 08 17 Document Z09 46 Page 5 BSK RPR S with mounting frame AR Figure 4 Dimensions of the BSK RPR S with mounting frame AR Figure 5 Dimensions of the BSK RPR S with mounting frame AR with...

Page 6: ...6 25 14 07 5 58 13 40 7 03 14 85 280 278 6 31 16 55 7 79 18 03 7 17 17 41 8 65 18 89 315 313 7 14 18 40 8 62 19 88 8 13 19 39 9 61 20 87 355 353 8 08 20 53 9 56 22 01 9 19 21 64 10 67 23 12 400 398 9...

Page 7: ...supply voltage in accordance with regula tions Technical data drive X10 ExMax 5 10 BF Power supply 24 240 V AC DC 10 each self adaptable Frequency 50 60 Hz 20 Power consumption Holding max 20 W Heatin...

Page 8: ...irement of statically load bearing lintels may have to be taken into considera tion Improper transport handling may result in dam age functional impairment In addition to that the film of the transpor...

Page 9: ...by contact or inhaling hazard ous substances must be excluded by taking appropriate safe ty measures Prior to maintenance or inspection all system components up and downstream of the device must be s...

Page 10: ...odel BSK RPR Additional operating instructions according to ATEX 94 9 EC MODELS AND DIMENSIONS Construction subject to change No return possible Version 2015 08 17 Document Z09 46 Page 10 Certificate...

Page 11: ...Fire Damper Model BSK RPR Additional operating instructions according to ATEX 94 9 EC MODELS AND DIMENSIONS Construction subject to change No return possible Version 2015 08 17 Document Z09 46 Page 11...

Reviews: