Smoke extraction blade damper ERK-MB
TECHNICAL DOCUMENTATION
Sample of functional test protocol |
Construction subject to change
No return possible
Stand: 2019-10-08 | Page 35
SAMPLE OF FUNCTIONAL TEST PROTOCOL
SCHAKO
Ferdinand Schad KG
Steigstrasse 25-27
D-78600 Kolbingen
Phone: +49- (0)7463 / 980-0
Fax: +49- (0)7463 / 980-200
E-mail: info@schako.de
Web: www.schako.de
SAMPLE
Functional test protocol for smoke extraction blade dam-
pers
Cons. No. ____________________
Smoke extraction blade
damper no.:
Declaration of perfor-
mance no.:
Series:
Actuator:
The following functional steps have
been carried out according to the
documents installation, mounting
and operating instructions
before
commissioning
next
functional
check in:
_____________
next
functional test
in:
_____________
next
functional test
in:
_____________
next
functional test
in:
_____________
External check:
System: _____________________
Item: _______________________
Internal check:
System: _____________________
Item: _______________________
Additional check:
System: _____________________
Item: _______________________
without defects
Date / tester
with defects (see back)
Date / tester
without defects
Date / tester