Check the following before installation:
Figure 13
Figure
14 (
Aerial View
)
3.3 Installation
3.3.1 Preparations for the motor installation
The swing gate operator must not be used with defective or sluggish gates. Make sure your door has been
serviced and properly adjusted by a knowledgeable person or professional before installation. The operator is not
intended to compensate for an already defective gate.
8)
Make sure that there is enough space when opening the gate leaves.
Porte 300
Porte 300
1)
Make sure that the gate weight and gate width do not exceed the specified maximum values of the
operator.
2)
Make sure that the gate construction is designed for the forces of the operator.
3)
Make sure the gate leaves open and close without friction, scraping, or draggin
g
.
4)
Make sure that both gate leaves are balanced and in a horizontal plane.
5)
Make sure that the surfaces and the leaves are designed for engine torque.
6)
Make sure that the transmitter and receiver of the photocell are mounted on a level surface and are in
proper alignment so that they are in contact with each other.
7)
Check the dimensions listed below.
Min
150 mm
150 mm (max)
9