SCHEMPP-HIRTH FLUGZEUGBAU GmbH., KIRCHHEIM/TECK
Arcus M
FLIGHT MANUAL
Section 4
4.
Normal operating procedures
4.1 Introduction
4.2 Assembly
4.2.1
Rigging and de-rigging
4.2.2 Refuelling
4.2.3
Power plant, removal and reinstallation
4.3
Inspections
a) Daily inspection
b) Inspection after reinstalling the power plant
4.4 Pre-flight
inspection
4.5
Normal procedures and recommended speed
4.5.1
Methods of launching
4.5.2
Take-off and climb
4.5.3
Flight / Cross country flight
(including in-flight engine stop / start procedures)
4.5.4 Approach
4.5.5 Landing
4.5.6
Flight with water ballast
4.5.7
High altitude flight
4.5.8
Flight in rain
4.5.9 Aerobatics
October 2011
Revision --
4.1.1