6. Technical data
Mains connection
230 V ~ 50 Hz
Motor rating W
2200
Operating mode
S1
Compressor speed
2850 min
-1
Pressure vessel capacity
(in liters)
50
Operating pressure
approx. 8 bar
Theoretical intake capacity (l/min)
approx. 412
sound power level L
WA
97 dB(A)
uncertainty K
WA
2.03 dB
Protection type
IP20
Weight of the unit in kg
approx. 41
Oil (15W 40) l
approx. 0,25
Max. altitude
(above mean sea level)
1000 m
The noise emission values were measured in accord-
ance with EN ISO 3744.
Wear hearing protection.
The effects of noise can cause a loss of hearing.
7. Before starting the equipment
•
Before you connect the equipment to the mains
supply make sure that the data on the rating plate
are identical to the mains data.
•
Prior to initial commissioning, remove the transport
plug (B) and fill the crank housing with oil as de-
scribed in item 8.4.
•
Check the equipment for damage which may have
occurred in transit. Report any damage immedi-
ately to the transport company which was used to
deliver the compressor.
•
Install the compressor near the point of consump-
tion.
•
Avoid long air lines and supply lines (extension ca-
bles).
•
Make sure that the intake air is dry and dustfree.
•
Do not install the compressor in a damp or wet room.
•
The compressor may only be used in suitable
rooms (with good ventilation and an ambient tem-
perature from +5 °C to 40 °C). There must be no
dust, acids, vapors, explosive gases or inflamma-
ble gases in the room.
•
The compressor is designed to be used in dry
rooms. It is prohibited to use the compressor in ar-
eas where work is conducted with sprayed water.
•
The oil level in the compressor pump has to be
checked before putting the equipment into opera-
tion.
8. Attachment and operation
m
Important!
You must fully assemble the appliance before using it
for the first time!
You will require the following tools for assembly and
installation:
•
2 x open-ended wrench size 19 mm (not included)
•
2 x open-ended wrench size 14 mm (not included)
8.1 Fitting the wheels (Fig. 5)
•
Fit the supplied wheels (11) as shown.
8.2 Fitting the supporting foot (2x) (Fig. 6)
•
Fit the supplied supporting foot (2x) as shown.
8.3 Fitting the air filter (2x) (Fig. 7, 8)
•
Remove the transportation stop (A) and screw the
air filter (14) to the equipment.
8.4 Changing the transportation cover (B)
(Fig. 9, 10)
•
Remove the transport lid (B) of the oil filling open-
ing.
•
Fill the included compressor oil into the crank hous-
ing and insert the included oil sealing plug (15) into
the oil filling opening.
8.5 Mains connection
•
The compressor is equipped with a mains cable
with shock-proof plug. This can be connected to
any 230-240 V ~ 50 Hz shock-proof socket.
•
Before you use the machine, make sure that the
mains voltage is the same as the operating voltage
(see the rating plate).
•
Long supply cables, extensions, cable reels etc.
cause a drop in voltage and can impede motor
start-up.
•
At low temperatures below +5°C, sluggishness may
make starting difficult or impossible.
8.6 ON/OFF switch (Fig. 2)
•
Pull the ON/OFF switch (16) upwards to switch
on the compressor. To switch off the compressor,
press the ON/OFF switch down.
8.7 Setting the pressure (Fig. 1, 3)
•
Use the pressure regulator (5) to set the pressure
on the pressure gauge (4).
•
The set pressure can be drawn from the quick lock
coupling (3).
•
The vessel pressure can be read off the pressure
gauge (6).
•
The vessel pressure is drawn from the quick lock
coupling (7).
Summary of Contents for 5906101901
Page 148: ...www scheppach com service scheppach com 49 08223 4002 99 49 08223 4002 58 148 BG t...
Page 157: ...www scheppach com service scheppach com 49 08223 4002 99 49 08223 4002 58 BG 157 11 2012 19 E...
Page 177: ...www scheppach com service scheppach com 49 08223 4002 99 49 08223 4002 58 177...