background image

Instruction Guide  

ICID Double Wall Adjustable Starter Section

  

  Schiedel Chimney Systems Ltd. 

Crowther Estate 

Washington 

Tyne & Wear NE38 0AQ 

Tel. 0191 4161150 

Follow SchiedelUK 

  

  

  

 

Visit our website: 

Schiedel.co.uk

 

 

 

 

INITIAL INSTALLATION  

 

1.  Remove loose strip of insulation and keep to one side. 
 

 

2.  Insert male spigot of liner into the appliance spigot. 

 

3.  Seal using the rope gasket, fire cement or similar. 

     

 

4.  Insulate liner using strip of insulation with joint to rear. 

Width of insulation strip can be trimmed to suit. 

       

5.  Slide adjustable case down over the insulation to cover the  

appliance spigot. 

  

Please see reverse side of this guide for instructions to allow 
removal of stove for servicing and re-installation of stove. 

 

 

Reviews: