Schindler 3100/3300/6300
J 43402603 / 01
213/269
Copyright © 2017 INVENTIO AG
Check Lock
Engagement on First
Contact
[41353545_025; 03.07.2014]
No
Step
1
Press the carriers into the closed stopper rubber.
2
Move the KTC contact bridge (1) into the housing (2) until a first contact is
established.
3
Check the CDL engagement is
≥
7 mm.
1
Contact bridge
2
Contact housing
1
2