4 • Schlage • AD-250 user guide
Getting started
Follow these steps when setting up a new lock.
1. Install the lock. See the installation guide that came with the lock, or visit
www.schlage.com/support, for more information.
2. Make sure the batteries are installed properly. See
Batteries
on page 8 for more
information.
3. Configure the master construction credential (where applicable). See
Construction
access mode
on page 5 for more information. The lock will remain in construction
access mode until you are ready to set up the rest of the system.
4. Test the lock for proper mechanical and electronic operation. See
Test lock operation
on
page 6 for more information.
5. Consult the Schlage Utility Software (SUS) user guide for information about configuring
the lock.
6. Familiarize yourself with the information contained in this user guide.
Save this user guide for future reference.
Schlage Utility Software (SUS)
The Schlage Utility Software is used for programming and setup only.
The Schlage Utility Software (SUS) is used to configure locks. This includes transferring
data files between the access control software and locks. For further information about
SUS, see the SUS user guide.