background image

EN

4

© Schletter GmbH 

 Gewerbegebiet an der B15 

 Alustraße 1 

 83527 Kirchdorf/Haag i. OB 

 Germany 

 Tel.: +49 8072 9191-200

Fax: +49 8072 9191-9200 

 E-mail: solar@schletter.eu 

 www.schletter.eu 

 Updated 11/2012 

 Subject to change without notice

Your contact in the UK: Schletter UK Limited, Tel.: +44 1296 461 800, Fax: +44 1296 461 801, E-mail: info@schletter.co.uk

CompactDirect Mounting Instruction

 

Mount module-bearing profile

• 

Feed square-head screws M10x25 
into lower groove of the module 
bearing profile and into holes of the 
supports.

• 

Secure with flange nuts M10.

The upper hole is used only in a linear 
arrangement. Please observe data in 
the calculation documentation.

 

Module mounting

• 

Position fi rst module to end of the profi le

• 

Fasten module with two end clamps - 
in our example: click in the Rapid end 
clamps and tighten screws (6-Lobe T40)

• 

Position further modules and secure 
each by placing two middle clamps 
respectively between two modules.

• 

Secure last module of a row with 
two end clamps.

Further information relating to mount-
ing of fasteners can be taken from the 
type-specific mounting instructions.

 

Extend module-bearing profile

• 

Position next profi le.

• 

Mount connector E from below.

• 

Tighten the pre-assembled screws.

 

Please ensure that sufficient space is 

left at profile joints for the connector.

© Schletter GmbH, 2012, I400250GB, V1

For further information relating to our systems, please refer to our website: 

www.schletter.eu

 under Downloads in the Solar section.

Summary of Contents for CompactDirect

Page 1: ...used Risk of injury Objects falling from the roof can cause injury to people The danger area around the installation site must be sealed off and people close to this area must be warned Risk of breakage Never step on PV modules these can be damaged under the weight Risk of electric shock The mounting and maintenance of the PV modules must be carried out by qualified personnel only Please observe t...

Page 2: ...type specific or from the generic mounting instructions Mounting and Project Planning Define the area of installation Concentrate the number of fasteners in edge and corner zones Please observe further recommenda tions from the structural analysis Calculation formula e min x y or 2 h x y e 4 e 4 e 10 e 10 e 10 e 10 e 4 e 4 h Building Position fasteners Note measurement A Please observe the shading...

Page 3: ... E mail info schletter co uk CompactDirect Mounting Instruction Prepare bolt joints if using hanger bolts as fasteners Loosen upper nut and regulate lower nut to align height of fastener Assemble the supports Connect support strut to support base using bolt M8 with nut M8 Tighten remaining bolts on the support Secure support base Fold out support and position it on the fastener Secure support base...

Page 4: ...he calculation documentation Module mounting Position first module to end of the profile Fasten module with two end clamps in our example click in the Rapid end clamps and tighten screws 6 Lobe T40 Position further modules and secure each by placing two middle clamps respectively between two modules Secure last module of a row with two end clamps Further information relating to mount ing of fasten...

Reviews: