©
Schletter GmbH
as of 10/2016
PvMax3
Mounting Instructions
22
/
35
4.4. Tools
In the following, the tools that are usually required for mounting the PvMax3 system are listed. Additional tools that are
required for special cases (for example encasing the foundations in concrete) are not listed here.
4.4.1. Surveying, staking and aligning the foundations
4.4.2. Rack mounting
•
Measuring tapes (100 m)
•
Line pins (about 20 pieces)
•
Mason's lacing cord
•
Club hammer
•
Wooden stakes
•
Color spray (for ground marking etc.)
•
Permanent marker
•
Spirit level
•
Shovel
•
Chains / straps to lift the foundations
•
Torque wrench (30 Nm to 60 Nm)
•
Wrench socket size 17
•
Wrench socket size 19
•
Hammer
•
Angle meter (goniometer) - spirit level
•
Measuring tape
•
Mason's lacing cord
•
Cordless screw driver
•
Drill hammer with drill
•
Air pump for blowing out the drill holes
We recommend using torque wrenches for all bolted connections. With fast rotary motions,
there is an increased danger of "jamming / bolt blocking"!
NOTICE
For the assembly of the PvMax3 system, please exclusively use the tools recommended.
If you use tools that are not intended for this purpose, the rack can be damaged and the structural safety of
the plant could thus be endangered!
The selected fasteners (for example screw anchors/dowels) must be appropriate for the fastening forces that
are specified in the structural analysis! The customer has to add an accordant structural verification to the
documents.
The fasteners are NOT included in the scope of delivery!