©
Schletter GmbH
as of 10/2016
PvMax3
Mounting Instructions
26
/
35
Fig. 5.1.-1 (pre-drilling the concrete foundation)
1.
Please refer to the rack drawings
to determine the positions of the
base brackets and pre-drill as
indicated there.
1.
Insert the fasteners into the
pre-drilled holes as specifi ed in
the manufacturer information.
Fig. 5.1.-2 (inserting the fasteners)
2.
2.
Position the strut assembly onto
the fasteners and fasten using
nuts.
3.
3.
Fig. 5.1.-3 (positioning and fastening the strut assembly)
Fig. 5.1.-4 (PvMax3 front base bracket)
Fig. 5.1.-5 (PvMax3 rear base bracket)