3 Transport / Packaging / Storage
Operating Instructions | Version 1.0 (05-2018) | Uni-M Ferrule
11 | 32
3
TRANSPORT / PACKAGING / STORAGE
During unpacking, transportation or storage of the product always observes the following instructions. They
contain important information to avoid injury to the operator and property damage. Take into consideration
the weight of the machine during transportation and loading.
NOTICE
Damage due to improper transportation!
Transportation by unqualified personnel may lead to extensive property damage. Therefore:
■
Handle with care and always observe the symbols and hints on the packaging and the product when un-
loading and placing on site location.
■
The instructions in this chapter must be carried out by
qualified personnel
!
3.1
TRANSPORT INSPECTION
Check the goods immediately after receiving for completeness and loss during shipment.
For loss on the packaging during shipment, proceed as follows:
■
Do not accept the delivery or only with exceptions.
■
Declare loss of shipment.
■
Immediately report damages on the product.
NOTICE
Packaging notice!
If provided, observe the packaging notice on the machine. Please dispose of waste appropriately.
3.2
UNPACKING / LOADING
Carefully open the package and remove contents. Upon receipt of the applicator, please verify that:
•
The packing must be intact and without signs of tampering
•
The applicator has not been damaged during transport.
•
The same serial number is marked both on the tool, instruction manual and
delivery note.
•
In the event of damage or non-matching serial number, please contact the
supplier.
Just before installation in the press, remove the rubber crash protection ring (1) be-
tween the crimp height dials (2) and the applicator body.
NOTICE
Prevent tooling damage!
It is highly recommended to replace the rubber crash protection ring (1) after the applicator is removed from
the press. This will prevent tooling damage during handling.
TIP
Retain the original packaging
It is recommended to retain the original packaging in the event that the product needs to be shipped to an-
other facility or to the supplier for service.
1
2