INSTALLATION
30.30.01.00176/01
www.schmalz.com
EN | 29
5.2.2 Preparing the earthing for the vacuum supply hose
Equipotential bonding using the metal support spindle on the vacuum supply hose (3):
Before performing the installation, prepare both ends of the vacuum supply hose as
follows (see the figures).
1. Lay out the vacuum supply hose.
2. Cut into the hose wall material for approx. 30 mm along the support spindle.
3. Strip the support spindle.
4. Bend the support spindle 90°.
WARNING
Falling tube lifter
Risk of injuries
►
Before the start of operations, ensure the following:
The end attachments at the end of the crane jib (when using jib cranes) or
the crane rails (when using crane systems) are securely fastened.
The tube lifter is securely attached to the suspension eye.
3