INSTALLATION
32 | EN
www.schmalz.com
30.30.01.00176/01
1. From the (stainless-steel) suction cup to the customer's equipotential bonding connection
2. From the tip of the crane jib to the customer's equipotential bonding connection
All other attachment parts that are not located between the measuring points specified
above also require a low resistance connection with equipotential bonding.
Take measurements to verify the resistance where necessary.
5.4 Setting the hovering position
On the tube lifter, you can set the hovering position with and without a load to a working height
adapted to the activity.
If the hovering position is not set before the start of operations, the lift tube may be
damaged by moving it to the end stop (the top position).
5.4.1 Without load
Turn the adjusting screw (6.4) on the operator handle (this can be accessed from below or from the
side).
Turn clockwise
the tube lifter is lowered
Turn counterclockwise
the tube lifter is raised
Note on the hose cylinder
Lower hovering position
Lift hovering position
6.4