1 About this document
1.1 Function
This document provides all the information you need for the mounting, set-up and commissioning to ensure the safe
operation and disassembly of the switchgear. The operating instructions enclosed with the device must always be
kept in a legible condition and accessible.
1.2 Target group of the operating instructions: authorised qualified
personnel
All operations described in the operating instructions manual must be carried out by trained specialist personnel,
authorised by the plant operator only.
Please make sure that you have read and understood these operating instructions and that you know all applicable
legislations regarding occupational safety and accident prevention prior to installation and putting the component
into operation.
The machine builder must carefully select the harmonised standards to be complied with as well as other technical
specifications for the selection, mounting and integration of the components.
The information contained in this operating instructions manual is provided without liability and is subject to
technical modifications.
1.3 Explanation of the symbols used
F
Information, hint, note:
This symbol is used for identifying useful additional information.
2
Caution:
Failure to comply with this warning notice could lead to failures or malfunctions.
Warning:
Failure to comply with this warning notice could lead to physical injury and/or damage to the machine.
1.4 Appropriate use