Installation manual
Page 173 of 204
Risk assessment as per EN ISO 13849-1
S
– Severe physical injury
S1 = minor, reversible injury
S2 = severe, irreversible injury
F
– Frequency and/or duration of exposure
to danger
F1= rarely, not cyclic
F2 = frequently up to permanent and/or long
duration, cyclic operation
P
– Possibility to avoid the danger
P1 = possible, slow movement / acceleration
P2 = hardly possible, high acceleration in
case of a fault
Risk assessment as per EN ISO 61508
a
1
2
3
4
b
W
3
---
a
1
2
3
4
W
2
---
---
a
1
2
3
W
1
--- = keine Sicherheitsanforderung
a = Keine speziellen Sicherheitsanforderungen
b = eine einzelnes E/E/PES ist nicht ausreichend
1,2,3,4 = Sicherheits-Integritätslevel
C
A
C
B
C
C
C
D
F
A
F
B
P
A
P
B
F
A
F
B
F
A
F
B
P
A
P
B
P
A
P
B
P
A
P
B
x
1
x
2
x
4
x
3
x
5
x
6
Startpunkt
Abschätzung der
Risikominderung
C = Risikoparameter der Auswirkung
F = Risikoparameter der Häufigkeit und Aufenthaltsdauer
P = Risikoparameter der Möglichkeit, den gefährlichen Vorfall
zu vermeiden
W = Wahrscheinlichkeit des unerwünschten Ereignisses
The risks to be examined can also be found in applicable regulations and standards, or must
be considered separately by the manufacturer based on his specific knowledge of the
machine.
For machines sold within the EU the minimum risks to be examined are specified in the EU
machine directive 2006/42/EU or in the latest version of this directive.
Starting point
Estimation of risk
minimization
Low contribution to risk
reduction
High contribution
to risk reduction
C = Risk parameters of the effect
F = Risk parameters of the frequency of the dwell time
P = Risk parameters of the possibility to avoid the dangerous incident
W = Probability of the undesired event
- = no safety requirement
a = No special safety requirements
b = a single E /E /P E S is not sufficient
1,2,3,4 = Safety integrity level
Summary of Contents for PSCBR-C-10 Series
Page 1: ...Installation manual Page 1 of204 Installation Manual For PSCBR modules Series PSCBR C 10...
Page 178: ...Installation manual Page 178 of 204...
Page 181: ...Installation manual Page 181 of 204 Example for a risk analysis Gefahrenanalyse Risk analysis...