Activating your application 

Before you are able to use the Xact application on your Android based 

device, you must first enter your activation code.  If you have not received 
your  activation  code  please  contact  your  system  administrator  or  your 
Xact sales representative. 

The application will walk you through step by step the entire set up 

process.    Just  ensure  that  you  follow  all  prompts  and  answer  all 
questions  accurately,  to  set  up  the  Xact  System  with  your  particular 
tank. 

 

New Installation 

To  install  a  new  system  on  your  tank,  you  must  first  run  the  Xact 

application  on  your  Android  based  device.    Once  the  application  is 
running,  connect  in  your  Bluetooth  adapter  and  battery  on  your  Xact 
unit.  When both of these are connected, select 

New Install

 

On  the  first  screen you  need  to  confirm  that  the  Time  Zone,  Time, 

and  Date  are  correct  (select 

Accept

  or 

Change

).    The  date  and  time 

information shown will be used to set the clock in the Xact System, and 
will become the basis for all subsequent measurement schedules.

 

If you select 

Change

, you will need to input the correct date and time 

information on your device.  When completed, push the 

back

 button on 

your device to return to the set up process. 

Summary of Contents for Xact

Page 1: ...nk Monitoring System Operation Manual XLL100200 Rev 3 0 Productivity through Precision A product of Schmitt Industries Inc 2765 NW Nicolai Street Portland Oregon 97210 USA Phone 503 227 7908 http www...

Page 2: ...ded results and for the installation use and results obtained License Terms And Conditions a You are granted a non exclusive perpetual license to use the Software solely on and in conjunction with the...

Page 3: ...the Xact Small Tank Monitoring System XLL100200 Revision 3 0 2013 Schmitt Industries Inc 2765 NW Nicolai St Portland OR 97210 USA Phone 503 227 7908 Fax 503 223 1258 www xact data com U S Patent Numb...

Page 4: ...n 2 Group D See control drawing in Appendix A of this manual Warning Explosion Hazard Do Not Remove or Replace Lamps Fuses Battery or Plug In Modules As Applicable Unless Power Has Been Disconnected o...

Page 5: ...ions 3 Installation of Sensor 3 System Setup and Calibration 4 Activating your application 5 New Installation 5 Set Monitoring Mode 6 Setting Alarm Levels in Event Monitoring Mode 7 Setting Measuremen...

Page 6: ......

Page 7: ...ut the manual where they apply but may not appear in this summary Before installing and operating Xact Small Tank Monitoring System it is necessary to read and understand the entirety of this manual A...

Page 8: ...ank By monitoring the time of flight referenced against measured tank dimensions tank fill levels are automatically calculated and displayed on the Xact Website The Satellite Box is mounted to the top...

Page 9: ...ntimeters in preparation for system setup and calibration Measure the circumference of the tank using a flexible tape measure Locate the manufacturer nameplate to determine the tank wall thickness If...

Page 10: ...evenly distributed between the wall of the tank and the face of the Sensor Ensure the Sensor is aligned to the centerline on the tank as you finish With the sensor installed on the tank remove the st...

Page 11: ...ew Installation To install a new system on your tank you must first run the Xact application on your Android based device Once the application is running connect in your Bluetooth adapter and battery...

Page 12: ...ontinue Set Monitoring Mode A critical step in the set up process is selecting which of the two available monitoring modes is desired for this Xact installation Scheduled Monitoring Measurements are t...

Page 13: ...ment Cycles in Scheduled Monitoring Mode Only active in Scheduled Monitoring Mode On the following screens you will setup a schedule that determines how often the Xact Tank Monitoring System will take...

Page 14: ...enter the tank wall thickness unless you entered an inside diameter If the unit of measure is a fraction divide the top number by the bottom number to calculate the required decimal equivalent e g 5...

Page 15: ...he Xact Sensor for optimal performance for the individual tank Progress of the Calibration is indicated by the bar and should complete in about 2 6 minutes The application indicates if the calibration...

Page 16: ...trap into a V shape facing up Slip the open part of the V through the slot in the plate Once through open it until it lays flat Repeat this process on the other side Once the strap is in place cinch i...

Page 17: ...orrectly aligned on the bottom of the tank and the strap is cinched tight enough that it pulls the sensor up into the bottom of the tank Changing The Battery To change the battery loosen the strap so...

Page 18: ...with less than 20 fill 2 Loosen the strap and remove the sensor Ensure that the tank is free of debris at the installation point and that the tank is level from end to end Clean the gel off of the le...

Page 19: ...SMITTER ST M12 ASSOCIATED NON INCENDIVE FIELD WIRING APARATUS TRANSDUCER POWER Blue VBAT RS232 Purple SDATA White PDA_RX Yellow PDA_TX Brown VBAT Red VBAT Orange GROUND Green GROUND Pink SCLK Black MA...

Reviews: