background image

1. The creepage protector will 
    automatically cut off the circuit if the 
    current is too high.

2. Volume control

3. Waste water free piping system

Page7

Page8

Unique Point:

Installation Process

Installation Process

13. Seal the barthtub edge by silicon glue as follows 

Summary of Contents for HAMBURG

Page 1: ...it can be wiped off with warm citric acid or vinegar by a soft cloth 4 Don t clean the tub and with hard or coarse material to avoid any scratches 5 Don t clean the tub and with gasoline to avoid any damages 6 It is not recommended to leave water in the tub for a long time or use this tub for washing purpose Pls drain off the water after the bath and dissconnect the power supply 7 There should be ...

Page 2: ... pressure sugar diabetes should not take a steam shower or bath when feeling sick The kid is suggested to be accompanied by an adult when taking a bath 2 Don t take a bath alone after drinking wine with alcohol or excess sports 3 The water temeperature should be below 45 during shower and the recommended temperature is 30 38 4 Don t take a bath for a long time Recommended time 15 21 5 All the info...

Page 3: ... spanner to screw it 5 Distinguish the water pipes of faucet 6 Use spanner to screw the tie in Installation Process Preparations 680mm 1630mm 1630mm 1 Control Panel 2 Inlet Waterfall 3 Switch Handle 4 Cold Water Handle 5 Hot Water Handle 6 Shower Head 7 Small Jets 8 Pillow 9 Volume Control Water Circulation Light Drainer Drainer Switch 11 12 13 14 10 15 Air Jets Big Water Jets 600mm 600mm 560mm Dr...

Page 4: ...the bathtub then install downcomer 6 Use thread sealing tape to wrap around the drain hole 7 Make the thread sealing tape smooth 8 Fasten the drain tube 9 Put downcomer into the drain hole on the ground 11 Put plugs into the drain hole 10 Drain sewage of the tube then connect the cold and hot water pipe separately 12 Install pillow Installation Process Installation Process ...

Page 5: ... automatically cut off the circuit if the current is too high 2 Volume control 3 Waste water free piping system Page7 Page8 Unique Point Installation Process Installation Process 13 Seal the barthtub edge by silicon glue as follows ...

Page 6: ... the underwater light is on if it flashes the ozonation function is effective Remarks when the underwater light is on and ozonation function is effective this indicator will flash 5 times and pauses once then continue to flash Power Switch Heat Switch MEMORY TAKE Programs Switch Water Light Switch CD RADIO Switch Function Indicate Light Water Pump Switch LED Display Screen Volume Increasing Channe...

Page 7: ...reset Temperature by factory 45 6 Temperature Setting 6 Temperature Setting VOL Please Press The Key TECHNICAL DATA 1 Voltage AC220V 10 50Hz AC110V 10 60Hz 2 Power 3500W 3 Dielectric Strength 1500V 1min 4 Lighting Load AC12V 20W 5 Music Power 15W 6 Frequency Range FM88 108MHz 7 S N Radio 45dB 8 AIR PUMP AC220V50Hz 1kW 9 HEAT POWER AC220V50Hz 1 5kW 10 AC12V 20W 11 WATER PUMP POWER 1kW Ozone OPERATI...

Page 8: ...ose the desired volume by pressing VOL or VOL 3 External CD PRECAUTIONS 4 Key Description 1 It is the store function after pressing or after station selection and direct pressing of the key is selecting the channels that have been memorized 2 VOL and VOL Function it is for temperature adjustment when the radio and CD functions are ineffective while the radio or CD functions is effective it is for ...

Reviews: