Commissioning
95
3
Commissioning
Perform the following activities for initial comissioning:
l
Set the date and time
l
Connect the plug-in power supply (for printer functions).
1 Press and hold down the <
ì
> key.
2 Press the <on/off> key.
The
display test appears briefly on the display.
The measuring instrument then switches automati-
cally to the setting of the baud rate.
3 Press the <run/enter> key repeatedly until the date
flashes on the display.
4 Set today’s date by pressing <
▲
> <
▼
>.
5 Confirm with <run/enter>.
The date (month) flashes on the display.
6 Set the current month by pressing <
▲
> <
▼
>.
7 Confirm with <run/enter>.
The year appears on the display.
8 Set the current year by pressing <
▲
> <
▼
>.
9 Confirm with <run/enter>.
The hour field flashes on the display.
10 Set the current time by pressing <
▲
> <
▼
>.
11 Confirm with <run/enter>.
The minutes field flashes on the display.
12 Set the current time by pressing <
▲
> <
▼
>.
13 Confirm with <run/enter>. The measuring instrument
then switches to the measuring mode.
14 Switch off the instrument by pressing <on/off>.
Setting the date
and time
Summary of Contents for CG 853P
Page 18: ...Safety 94 ...
Page 28: ...Operation 104 7 Perform an AutoRead measurement according to section 4 2 ...
Page 74: ...Lists 150 ...