Open the foundation shaft and drainage
according to column’s planting depth.
The calculation is based on the hole into which the lighting column is planted being
back-filled with the excavated material or material of better quality. The following should
be specified to the installer:
a)
all back-filling material is to be placed in 150 mm thick layers and be well compacted;
b)
during compaction, care is to be taken to ensure that the corrosion protection system
of the lighting column is not damaged;
c)
when the hole is back-filled with concrete, the concrete is to extend from the base of the
lighting column to ground level;
d)
where paving or bituminous surfacing is to be applied around the lighting column, the top
level of the concrete may be lowered by the thickness of this surfacing;
e)
a duct with the same dimensions as the lighting column's cable entry slot is to be formed in
the concrete using a suitable preformed lining tube.
Foresee the electrical cable ditch where the
flexible pipe is mounted.
Leave typically at 0.5m below ground level.
Put the column in place guiding the
underground electrical cables through
the pipe until they reach the base compartment
and the column is at the right depth.
800/1000mm
31.5/39.4in
500mm
19.7in
1
2
3
4
00-63-030 | DOC-0016143 Rev C | 11-2019
RECESSED MOUNTING
E
250mm
9.8in
500mm
19.7in
800/1000mm
31.5/39.4in