3.3 Tractor Hydraulics
The cutter deck and wings are raised and lowered with hydraulic cylinders operated by the tractor hydraulic
pump. The tractor operating the cutter must have two double acting hydraulic circuits operating at 2500 PSI
(17.2 MPa). One circuit for the operation of the phasing system and one for the wing lift system.
DO NOT
use a PTO adapter to attach a non-matching Implement driveline to a Tractor PTO.
Use of an adapter can double the operating speed of the Implement resulting in excessive
vibration, thrown objects, and implement failure. Adapter use will also change the working
length of the driveline exposing unshielded driveline areas. Serious bodily injury and/or
equipment failure can result from using a PTO adapter. Consult an authorized dealer for
assistance if the Implement driveline does not match the Tractor PTO.
(S3PT-14)
Never operate the Tractor and Mower if the Implement input driveline is directly connected
to the Tractor transmission. Tractor braking distances can be substantially increased by the
momentum of the rotating Mower blades driving the Tractor transmission even though the
Tractor clutch has been disengaged. Install an over running clutch between the Tractor
PTO and the Mower driveline to prevent this potentially dangerous situation.
(S3PT-16)
3.6 Tire Spacing
Tractor tires should be set a minimum of 60” (1.5
m) apart measured from inside of tire to inside of
tire, or maximum width possible. Refer to the
tractor Operator’s Manual or consult an
authorized dealer for instructions to change
tractor tire spacing.
OPS-R-0062
3.4 Front End Weight
A minimum of 20% total tractor weight must be maintained on the tractor front end at all times. Front end
weight is critical to maintain steering control and to prevent the tractor from rearing up while driving. If the
front end is too light, add weight until a minimum of 20% total weight is reached on the front tires. Front
weights and weight carriers can be purchased through an authorized tractor dealership.
OPS-U-0005
3.5 Power Take Off (PTO)
This mower is designed to operate at a PTO speed of 1000 RPM. The operating speed of the mower and
tractor can be determined by the number of splines on the driveline yoke and PTO output shaft. Those
operating at 1000 RPM will have a 1-3/8” 21-spline shaft or a 1-3/4” 20 spline shaft.. Refer to the tractor
owner’s manual for instructions to change PTO speeds on models that operate at more than one speed.
If operating an older model tractor where the tractor’s transmission and PTO utilize one master clutch, an
over-running clutch must be used between the PTO output shaft and the driveline of the mower. An
authorized tractor dealer can provide the over-running clutch and its installation if needed.
OPS-U- 0006_F
Summary of Contents for FX-530
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2021 Alamo Group Inc SAFETY SECTION ...
Page 29: ...SAFETY FX 530 06 21 Safety Section 1 19 2021 Alamo Group Inc SAFETY Decal Description ...
Page 30: ...SAFETY FX 530 06 21 Safety Section 1 20 2021 Alamo Group Inc SAFETY ...
Page 31: ...SAFETY FX 530 06 21 Safety Section 1 21 2021 Alamo Group Inc SAFETY ...
Page 32: ...SAFETY FX 530 06 21 Safety Section 1 22 2021 Alamo Group Inc SAFETY ...
Page 33: ...SAFETY FX 530 06 21 Safety Section 1 23 2021 Alamo Group Inc SAFETY ...
Page 34: ...SAFETY FX 530 06 21 Safety Section 1 24 2021 Alamo Group Inc SAFETY ...
Page 35: ...SAFETY FX 530 06 21 Safety Section 1 25 2021 Alamo Group Inc SAFETY ...
Page 36: ...SAFETY FX 530 06 21 Safety Section 1 26 2021 Alamo Group Inc SAFETY ...
Page 37: ...SAFETY FX 530 06 21 Safety Section 1 27 2021 Alamo Group Inc SAFETY ...
Page 39: ...Introduction Section 2 1 2021 Alamo Group Inc INTRODUCTION SECTION ...
Page 45: ...Assembly Section 3 1 2021 Alamo Group Inc ASSEMBLY SECTION ...
Page 58: ...ASSEMBLY FX 530 03 21 Assembly Section 3 14 2021 Alamo Group Inc ASSEMBLY ...
Page 60: ......
Page 61: ...Operation Section 4 1 2021 Alamo Group Inc OPERATION SECTION ...
Page 115: ...Maintenance Section 5 1 2021 Alamo Group Inc MAINTENANCE SECTION ...
Page 119: ...MAINTENANCE FX 530 06 21 Maintenance Section 5 5 2021 Alamo Group Inc MAINTENANCE ...
Page 135: ...MAINTENANCE FX 530 06 21 Maintenance Section 5 21 2021 Alamo Group Inc MAINTENANCE ...
Page 136: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 29 2021 Alamo Group Inc SEGURIDAD ...
Page 137: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 28 2021 Alamo Group Inc SEGURIDAD ...
Page 138: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 27 2021 Alamo Group Inc SEGURIDAD ...
Page 139: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 26 2021 Alamo Group Inc SEGURIDAD ...
Page 140: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 25 2021 Alamo Group Inc SEGURIDAD ...
Page 141: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 24 2021 Alamo Group Inc SEGURIDAD ...
Page 142: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 23 2021 Alamo Group Inc SEGURIDAD ...
Page 143: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 22 2021 Alamo Group Inc SEGURIDAD ...
Page 144: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 21 2021 Alamo Group Inc SEGURIDAD ...
Page 145: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 20 2021 Alamo Group Inc SEGURIDAD ...
Page 146: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 19 2021 Alamo Group Inc SEGURIDAD ...
Page 147: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 18 2021 Alamo Group Inc SEGURIDAD ...
Page 164: ...Sección de Seguridad 1 1 2021 Alamo Group Inc SECCIÓN DE SEGURIDAD ...
Page 165: ......