7.3 Leveling Wing
1. The center section height should be set before
adjusting the wing sections. Make sure the
tractor is completely shut down, the cutter is
completely lowered, and the cutter and tractor
are secured in position.
2. To set the inner wing section height, adjust the
1-1/4” threaded rod on the wing adjustment
assembly to level the wings of the cutter with
the center section.
3. To raise or lower wing, back off nut “A” first then
adjust nut “B”. Retighten nut “A” and lock
washer after adjustment. To lower the wing,
retract the threaded rod. To raise the
wing,extend the threaded rod.
4. After the wings are set at the desired position,
retighten jamnuts to maintain height settings
LEVELING WING SECTIONS WITH CENTER
5. To set the outer wings, adjust the turnbuckle on
the wheel linkage to level the outer wings with
the inner wings.
Summary of Contents for FX-530
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2021 Alamo Group Inc SAFETY SECTION ...
Page 29: ...SAFETY FX 530 06 21 Safety Section 1 19 2021 Alamo Group Inc SAFETY Decal Description ...
Page 30: ...SAFETY FX 530 06 21 Safety Section 1 20 2021 Alamo Group Inc SAFETY ...
Page 31: ...SAFETY FX 530 06 21 Safety Section 1 21 2021 Alamo Group Inc SAFETY ...
Page 32: ...SAFETY FX 530 06 21 Safety Section 1 22 2021 Alamo Group Inc SAFETY ...
Page 33: ...SAFETY FX 530 06 21 Safety Section 1 23 2021 Alamo Group Inc SAFETY ...
Page 34: ...SAFETY FX 530 06 21 Safety Section 1 24 2021 Alamo Group Inc SAFETY ...
Page 35: ...SAFETY FX 530 06 21 Safety Section 1 25 2021 Alamo Group Inc SAFETY ...
Page 36: ...SAFETY FX 530 06 21 Safety Section 1 26 2021 Alamo Group Inc SAFETY ...
Page 37: ...SAFETY FX 530 06 21 Safety Section 1 27 2021 Alamo Group Inc SAFETY ...
Page 39: ...Introduction Section 2 1 2021 Alamo Group Inc INTRODUCTION SECTION ...
Page 45: ...Assembly Section 3 1 2021 Alamo Group Inc ASSEMBLY SECTION ...
Page 58: ...ASSEMBLY FX 530 03 21 Assembly Section 3 14 2021 Alamo Group Inc ASSEMBLY ...
Page 60: ......
Page 61: ...Operation Section 4 1 2021 Alamo Group Inc OPERATION SECTION ...
Page 115: ...Maintenance Section 5 1 2021 Alamo Group Inc MAINTENANCE SECTION ...
Page 119: ...MAINTENANCE FX 530 06 21 Maintenance Section 5 5 2021 Alamo Group Inc MAINTENANCE ...
Page 135: ...MAINTENANCE FX 530 06 21 Maintenance Section 5 21 2021 Alamo Group Inc MAINTENANCE ...
Page 136: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 29 2021 Alamo Group Inc SEGURIDAD ...
Page 137: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 28 2021 Alamo Group Inc SEGURIDAD ...
Page 138: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 27 2021 Alamo Group Inc SEGURIDAD ...
Page 139: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 26 2021 Alamo Group Inc SEGURIDAD ...
Page 140: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 25 2021 Alamo Group Inc SEGURIDAD ...
Page 141: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 24 2021 Alamo Group Inc SEGURIDAD ...
Page 142: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 23 2021 Alamo Group Inc SEGURIDAD ...
Page 143: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 22 2021 Alamo Group Inc SEGURIDAD ...
Page 144: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 21 2021 Alamo Group Inc SEGURIDAD ...
Page 145: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 20 2021 Alamo Group Inc SEGURIDAD ...
Page 146: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 19 2021 Alamo Group Inc SEGURIDAD ...
Page 147: ...SEGURIDAD FX 530 06 21 Sección de Seguridad 1 18 2021 Alamo Group Inc SEGURIDAD ...
Page 164: ...Sección de Seguridad 1 1 2021 Alamo Group Inc SECCIÓN DE SEGURIDAD ...
Page 165: ......