Assembly from Truck Shipment
The following are instructions to set up a GX-150
cutter that has been delivered on a truck.
When the cutter is received the hitch will be flipped
back onto the cutter as shown on
Figure AsmP-R-
0465
. The hitch must be flipped down into working
position and pinned to the tension link. Care should
be taken when flipping the hitch down as it is heavy
and will want to fall when it over centers so a lifting
device should be used. Line up the tension link and
the hitch as shown in
Figure AsmP-R-0125
. Use
the 1” washer and cotter pin that are provided to
attach the tension link to the hitch as shown in
Figure AsmP-R-0126
.
Summary of Contents for GX-150
Page 2: ......
Page 10: ......
Page 11: ...Safety Section 1 1 2021 Alamo Group Inc SAFETY SECTION ...
Page 27: ...SAFETY GX 150 03 21 Safety Section 1 17 2021 Alamo Group Inc SAFETY Decal Location ...
Page 29: ...SAFETY GX 150 03 21 Safety Section 1 19 2021 Alamo Group Inc SAFETY Decal Description ...
Page 30: ...SAFETY GX 150 03 21 Safety Section 1 20 2021 Alamo Group Inc SAFETY ...
Page 31: ...SAFETY GX 150 03 21 Safety Section 1 21 2021 Alamo Group Inc SAFETY ...
Page 32: ...SAFETY GX 150 03 21 Safety Section 1 22 2021 Alamo Group Inc SAFETY ...
Page 33: ...SAFETY GX 150 03 21 Safety Section 1 23 2021 Alamo Group Inc SAFETY ...
Page 34: ...SAFETY GX 150 03 21 Safety Section 1 24 2021 Alamo Group Inc SAFETY ...
Page 35: ...SAFETY GX 150 03 21 Safety Section 1 25 2021 Alamo Group Inc SAFETY ...
Page 36: ...SAFETY GX 150 03 21 Safety Section 1 26 2021 Alamo Group Inc SAFETY ...
Page 37: ...SAFETY GX 150 03 21 Safety Section 1 27 2021 Alamo Group Inc SAFETY ...
Page 38: ...SAFETY GX 150 03 21 Safety Section 1 28 2021 Alamo Group Inc SAFETY ...
Page 40: ......
Page 41: ...Introduction Section 2 1 2021 Alamo Group Inc INTRODUCTION SECTION ...
Page 47: ...Assembly Section 3 1 2021 Alamo Group Inc ASSEMBLY SECTION ...
Page 55: ...Operation Section 4 1 OPERATION SECTION ...
Page 108: ...OPERATION GX 150 03 21 Operation Section 4 54 2021 Alamo Group Inc OPERATION ...
Page 109: ...Maintenance Section 5 1 2021 Alamo Group Inc MAINTENANCE SECTION ...
Page 113: ...MAINTENANCE GX 150 03 21 Maintenance Section 5 5 2021 Alamo Group Inc MAINTENANCE ...
Page 129: ...MAINTENANCE GX 150 03 21 Maintenance Section 5 21 2021 Alamo Group Inc MAINTENANCE ...
Page 130: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 29 2021 Alamo Group Inc SEGURIDAD ...
Page 131: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 28 2021 Alamo Group Inc SEGURIDAD ...
Page 132: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 27 2021 Alamo Group Inc SEGURIDAD ...
Page 133: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 26 2021 Alamo Group Inc SEGURIDAD ...
Page 134: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 25 2021 Alamo Group Inc SEGURIDAD ...
Page 135: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 24 2021 Alamo Group Inc SEGURIDAD ...
Page 136: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 23 2021 Alamo Group Inc SEGURIDAD ...
Page 137: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 22 2021 Alamo Group Inc SEGURIDAD ...
Page 138: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 21 2021 Alamo Group Inc SEGURIDAD ...
Page 139: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 20 2021 Alamo Group Inc SEGURIDAD ...
Page 140: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 19 2021 Alamo Group Inc SEGURIDAD ...
Page 141: ...SEGURIDAD GX 150 03 21 Sección de Seguridad 1 18 2021 Alamo Group Inc SEGURIDAD ...
Page 158: ...Sección de Seguridad 1 1 2021 Alamo Group Inc SECCIÓN DE SEGURIDAD ...
Page 159: ......