background image

D191404
D191604
D191606

1836-6

09/21

- Montageanleitung
- Assembly instructions
- Notice de montage
- Montagehandleiding
- Návod na montáž
- Instructiune de montaj
- Navodila za namestitev
- Installationstruktioner

,

Summary of Contents for Juist

Page 1: ...D191404 D191604 D191606 1836 6 09 21 Montageanleitung Assembly instructions Notice de montage Montagehandleiding Návod na montáž Instructiune de montaj Navodila za namestitev Installationstruktioner ...

Page 2: ...lachkopfschraube 4x15 mm 2 1 x Brauestange E99533 Stück 44 00 13 1 x Dichtung 3 1 x Handbrause E99520 Stück 42 95 14 1 x Umsteller Einhebelmischer E99528 Stück 74 95 4 1 x Brauseschlauch 1 5 m E99515 Stück 26 95 15 1 x Schlauch 5 1 x Abdeckplatte rund inkl Pos 7 E99544 Set 94 00 16 2 x Schlauchschelle 6 1 x Griff Einhebelmischer inkl Pos 8 9 E99527 Set 64 00 17 1 x Dichtung 7 1 x Dichtung groß 18 ...

Page 3: ... 54 95 25 1 x Dichtung vertikal E99065 Stück 24 95 26 16 x Abdeckkappe 27 12 x Senkkopfschraube 3 5 x 12 mm 28 1 x Tür 29 2 x Laufrolle unten E99264 Stück 12 95 30 2 x Laufrolle oben E99265 Stück 12 95 31 2 x Griff komplett E99140 96 Stück 32 95 31 1 2 x Griff außen 31 2 2 x Griff innen 32 1 x Duschbecken E99590 154 00 33 2 x Stopfen für Magnet 41 2 x Seitenwand Schrauben und Abdeckkappenset E9920...

Page 4: ...round Partie inférieure du bordure tube partie supérieure du bordure bas Achterzi jde kant buis voorzi jde kant dorpel Wassseranschluss warm kalt Waterconnection hot cold Raccordement d eau chaud froid Aansluitin g van water heet koud Anschlussmaße Connection dimensions Dimensions de raccordement Aansluitmaten 4 325 375 ...

Page 5: ...Pos 32 Pos 32 Pos 10 Pos 32 Pos 1 Pos 11 Pos 11 Pos 12 1 2 1 2 5 ...

Page 6: ...Pos 17 Pos 5 Pos 17 Pos 19 Pos 11 Pos 2 Pos 1 3 4 6 Pos 13 Pos 15 Pos 16 Pos 18 Pos 14 Pos 6 ...

Page 7: ...5 6 Pos 3 Pos 20 Pos 4 Pos 2 Pos 6 Pos 8 Pos 9 7 ...

Page 8: ...hließen Warn chilled water connections waste not included as well as the discharge professionally attach Des raccordements d eau froide bonde non fourni ainsi que l ecoulement attacher de fa on appropriee Aansluitingen van koud water evenals niet bij levering inbegrepen het wegstromen naarbehoren vastmaken ...

Page 9: ...6x 6x Pos 27 10 11 12 Pos 23 Pos 22 9 Ø 3 mm Pos 23 ...

Page 10: ...Pos 41 13 14 Pos 22 10 ...

Page 11: ...Ø 3 mm 6x 15 6x Pos 27 11 16 Version a versie a Version b versie b ...

Page 12: ...18a 12 Pos 31 1 Pos 31 2 Pos 24 Pos 31 Pos 28 Pos 33 Pos 33 17a Pos 24 Pos 25 Türanschlag beachten door side fixing fixation montagezijde ...

Page 13: ...20a 13 19a 1 2 Pos 30 Pos 29 1 2 2 1 3 3 Oben top haut boven Unten down bas beneden ...

Page 14: ...18b 14 17b Pos 31 1 Pos 31 2 Pos 24 Pos 31 Pos 28 Pos 33 Pos 33 Türanschlag beachten door side fixing fixation montagezijde Pos 24 Pos 25 ...

Page 15: ...19b 2 20b 15 1 Pos 30 Pos 29 1 2 2 1 3 3 Oben top haut boven Unten down bas beneden ...

Page 16: ...21 22 16 24 h Pos 26 ...

Page 17: ...23 24 17 24 h 24 h ...

Page 18: ...50 mm 25 26 24 h 18 24 h ...

Page 19: ...19 27 50 mm 24 h ...

Page 20: ...r Inspection number Duschservice Zum Hohlen Morgen 22 59939 Olsberg Deutschland Germany Allemagne Duitsland Ersatzteilbestellung Fax 02962 972 4260 Allgemeine technische Probleme Telefon 02962 972 40 E Mail ersatzteile duschservice de 1836 6 ...

Reviews: