WSI 100 / 125 / 150 / 200 / 250 / 300
page
12
2.3.7 Installation
2.3.7.1. Without feet
If the floor or existing base is adequately level, it is possible to dispense with the feet. It is
sufficient to lay the enclosed insulating mats under the 4 corners of the machine and secure
them with 2 screws and dowels.
Lift machine
Place insulating mat underneath
Secure the machine with 2 of the dowels supplied.
1. Remove the rear bottom panel.
2. Lay the insulating mat underneath
(drill holes exist in the chassis).
3. Drill holes
4. Screw in
5. Fit rear panel again.
2.3.7.1. With feet
Align the machine horizontally by adjusting the levelling feet.
1.
Lift the machine.
2.
Screw the four feet into the threaded holes.
3.
Align the machine (water-level).
4.
Secure all 4 feet with counternuts.