Commissioning
24
02.00 | EMH | Assembly and Operating Manual | en | 1393220
6.2 Signal sequence "Product magnetization"
Ø
When adjusting the system-side "Product magnetization" process,
observe the following signal sequence:
Signal sequence during the "Product magnetization" process
1
Force signal A and force signal B:
adjust the required holding force level by switching on or off,
Note: set the force signals in time before the magnetization starts. The setting should
remain unchanged until the "Magnetization" signal is switched off.
2
"Demagnetization" signal:
ensure that the "Demagnetization" signal is switched off for the total magnetization
time needed.
3
"Magnetization" signal:
switch on the "Magnetization" signal and leave it switched on for at least 6 ms.
Note: the magnetization of the product is only complete once the activation time
has elapsed. The duration of the activation time depends on the size,