Assembly
03.00|0889148_ROTA NCX |en
31
•
Alternately tighten the mounting screws supplied to fix the
chuck to the spindle nose.
•
Check radial and axial run-out at the checking edge.
•
Ensure that the actuating force is functioning.
•
Insert and fasten the center sleeve (item 4) in the chuck body
(item 1) with the screws (item 24).
•
Move the cylinder to the front position. Unlock the wedge bars
with the jaw change key supplied and insert or offset the base
jaws into the chuck's jaw guidance as shown on markings 1, 2
or 3.
•
Check that the base jaw and the jaw stroke can easily move.
The parts are disassembled in the same way but in the reverse
order.
Lubricating before commissioning the lathe chuck
Before commissioning, move the chuck into the open position.
Using a high-pressure grease press, press SCHUNK special grease
LINOMAX plus into the lubricating nipple every 3 strokes. For
optimum grease distribution and to achieve the maximum
clamping force, close and open the chuck several times over the
entire clamping stroke. Check the clamping force and if necessary
repeat the lubrication procedure.
At regular intervals, check that the retainer ring (item 10) is
seated firmly.