Maintenance and care
11. To remove the spindle holding nut (item 3), the seat
of bearing (item 5) is removed from the spindle bearing
of the base jaw (item 2), then the spindle (item 4) is turned
counterclockwise.
12. Now the spindle holding nut (item 3) can be removed from the
base jaw (item 2).
13. There is an O-ring (item 9) and a grease nipple (item 15) on the
spindle (item 4).
During disassembly and assembly please take
care that the O-ring (item 9) does not become damaged.
14. The spindle holding nut (item 3) is fastened with a bearing bolt
(item 6). First remove the safety ring (item 12) and then pull
out the bearing bolt (item 6). (The bearing bolt has a pull-off
thread.)
During disassembly and assembly, please take care
that the safety ring (item 12) does not become damaged or
deformed.
Clean and degrease all parts carefully and check all parts for wear
and damage.
Only use original SCHUNK spare parts when replacing damaged
parts.
Before assembly, grease all individual components with a suitable
grease (LINO MAX).
To assemble the jaw box, complete the above procedure in
reverse order:
IMPORTANT: The mounting screws (item 11) must be assembled
with a medium-strength threadlocker.
31
04.00 | | Jaw boxes SPK | en | 0889015