Maintenance and care
34
02.00 | KSF3, KSF3-LH, KSF3-F | Assembly and Operating Manual | en |
1467140
1.
Connect the components to the open CLOSED connection in the
following order:
pressure gauge – shut-off valve – quick coupling – supply line.
2.
Pressurize the clamping force block.
3.
Close the shut-off valve and remove the supply line.
4.
Let the clamping force block sit clamped for 24 hours.
5.
After 24 hours, the clamping force block is:
–
sealed if the pressure gauge indicates a drop in pressure of
less than 0.5 bar.
–
leaking if the pressure gauge indicates a drop in pressure of
more than 0.5 bar.
If the clamping system is leaking, check the fittings first (e.g. with
Metaflux leak detection spray). Seal any leaking screws.
If the cause of the leak is not the fittings, send the product to
SCHUNK for repair.
Summary of Contents for TANDEM KSF3 100
Page 46: ...SCHUNK ...
Page 47: ...SCHUNK ...