Assembly
Removal from the installation space
Detachable threads facilitate removal of the modules from the
installation space of the clamping stations. To pull the clamping
module out of the installation space, two levering tools (e.g. long
cylindrical screws) are screwed diagonally into two existing
internal threads of the mounting holes.
4.3.1 NSE3 99, NSE3 99-K
Fastening in the installation space with 6 screws M6
The assembly module is positioned using the centering diameter of
the installation space:
Ø 99 H6
.
The air connection usually occurs via the bottom coupling holes in
the base of the unit.
Alternative connection option:
two M5 connections on the side.
In this case, the bottom openings must be sealed. To do so, insert
the Ø 4.5 x 1.5 O-rings into the module and seal the bottom direct
connections against the flat bearing surface.
Turbo connection → ←
Unlocking connection ← →
M5 air connection via fitting
M5 thread
M4 mounting thread
for monitoring system
Hose-free direct connection
(seal Ø 4.5 x 1.5)
* All clamping systems of equal height within 0.02 mm
Installation situation:
partial installation
Installation situation:
full installation
25
08.00 | NSE3 138, NSE-T3 138 | VERO-S quick-change pallet system | en |
1152197 -NSE3 NSE-T3