Assembly
22
08.00 | NSE3 138, NSE-T3 138 | VERO-S quick-change pallet system | en |
1152197 -NSE3 NSE-T3
CAUTION
Danger of injury due to sharp edges and rough or slippery
surfaces
•
Wear personal protective equipment, particularly protective
gloves.
1. Check the flatness of the mounting surface.
2. Screw the module with the O-rings inserted onto the clamping
station.
✓
Observe permissible tightening torques for the mounting
screws and the strength class.
.
✓
via the hose-free direct connection in the base of the quick-
change pallet system, OR
✓
via the supply lines at the side connections
– for NSE3 99 / -V1 / -K / V1-K: unscrew locking screw M5
and screw in air connections
– for NSE3 138 / -V1 / -V4 / -P / -K: unscrew locking screw
G1/8" and screw in air connections.
4. If necessary, connect the monitoring functions.
4.3 Fastening and connection
Flatness
If several linked clamping modules are mounted, make sure that
the flatness and height deviation of the outer ring bearing surfaces
from clamping module to clamping module (with respect to a 200
mm gauge) is ≤ 0.02 mm. The gauge deviation may not exceed ±
0.015 mm.
Redundancy
Due to redundancy, a clamping pin with positioning accuracy in
one direction (SPB 40, positioned diamond shaped) must be used
for clamping systems that are more than 160 mm apart or that do
not show a positioning tolerance of ± 0.01 mm. The diamond-
shaped alignment surfaces on the SPB 40 clamping pin must be
aligned at right angles to the longitudinal axis between clamping
pins SPA 40 and SPB 40. This allows for compensation of a distance
offset between the clamping areas to be aligned. For the clamping
areas that are not intended for aligning the device or pallet,
clamping pins with centering clearance (SPC 40) must be used (also
refer to the chapter "Clamping pins"