5 Acceptance and transportation
EN Concrete troweling BEG 90
16
4.6 Maintenance plan
Maintenance
Daily
Weekly
Clean machine with a gentle water jet and brush
X
Check blade adjustement
X
Check the screws of the blades, tighten them if necessary
X
Check motor oil level
X
Clean air filter
X
Check belt tension
X
Check blades
X
Change motor oil
See Honda operating
manual
Grease with the grease nipples
X
5 Acceptance and transportation
5.1 Accepting the machine
The machine is delivered in a complete and pack
aged condition from the manufacturer.
1.
Unpack the machine and check the enclosed
delivery slip to make sure all parts have been
delivered.
2.
Check whether any items have been damaged
in transit.
In case of damage, contact the transport com
pany immediately!
Report any problems to the manufacturer imme
diately!
Complaints at a later date cannot be acknowl
edged!
5.2 Transporting the machine
1.
When loading and transporting the machine,
support or secure the machine on the cross be
ams [8, Fig. A] of the guard ring [7, Fig. A].
The motor [9, Fig. A] must not be tilted and
must always be transported and stored in the
working position!
Secure the machine on the loading platform to
prevent it from slipping or tipping over!
Summary of Contents for BEG 90
Page 2: ...2 3 1 4 9 5 2 6 7 8 Fig A Fig B 4 Fig C D D E E Fig D 13 11 10 10 12 14...
Page 19: ......
Page 20: ......