7-98 Relay
Commissioning
Date Code 20060731
SEL-300G Instruction Manual
support the selection. Configure the voltage test sources to apply phase voltage with
magnitude equal to VNOM/1.732 volts (DELTA_Y = Y) or VNOM volts
(DELTA_Y = D) and frequency equal to:
1.1 • Ftest for an overfrequency element under test
or
0.9 • Ftest for an underfrequency element under test
Step 2.
Expect 81D
n
T to assert 81D
n
D seconds after the test signals are applied.
Step 3.
Apply the test voltages calculated in Step 1 and record the element operating time,
Ttest. Remove the test voltages.
Ttest = _________ seconds
Step 4.
Calculate the relay timing error using the equation:
%
100
DnD
81
DnD
81
Ttest
error
⋅
⎟
⎠
⎞
⎜
⎝
⎛
−
=
error = _________ %
Ground Differential (87N) Element
Equipment Needed
•
SEL-300G Relay under test.
•
Two AC Current Test Sources with adjustable magnitude.
•
PC with terminal emulation software and appropriate serial cable to connect the
PC-COM port to the relay.
Test Source Connections
Connect the current sources according to Figure 7.31.
Summary of Contents for SEL-300G
Page 1: ...SEL 300G Multifunction Generator Relay Instruction Manual 20060731 PM300G 01 NB ...
Page 4: ......
Page 6: ......
Page 138: ......
Page 166: ......
Page 170: ......
Page 288: ......
Page 290: ......
Page 328: ......
Page 442: ......
Page 456: ......
Page 458: ......
Page 468: ......
Page 470: ......
Page 512: ......
Page 516: ......
Page 518: ......
Page 552: ......
Page 554: ......
Page 560: ......
Page 578: ......
Page 626: ......
Page 724: ......
Page 728: ......